Friedrich & ClementBETA

ECOHYDROLOGICAL STUDY KIKBEEK and SBZ MECHELSE HEIDE

ECOHYDROLOGISCHE STUDIE KIKBEEK en SBZ MECHELSE HEIDE

Belgium · Brussel · how to bid here →

Your path to submission

  1. Deadline: 15 October at 14:00 — 9 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: NLD.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (225 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Hudson Belgium.n = 225
  • 25% of this buyer's awards went to companies that had already won here before (950 awards since 2022, spread over 697 companies). That is well above the sector norm (10%) — newcomers have a harder time here than elsewhere.n = 950 awards since 2022
  • 18% of awards went to companies from abroad (950 awards with a known winner country). Sector average: 29%.n = 950
  • The median procedure drew 5 bids (536 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 536
  • The award came in at a median 93% of the estimated value (17 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 17

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Belgium · Business services, 722 contracts went to foreign companies over the last 3 years (of 3,084 recorded awards) — mostly from France, Germany, Italy.

Submission language: NLD.

Typical field: median 6 (from 113 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The reason for the start of the ecohydrological study is the stability problems in the lake Kikbeek, as a result of which the level increases in relation to the achievement of the conservation objectives cannot currently continue. To investigate the effects of higher plas levels (than the current ones) in the Kikbeek quarry on the surrounding groundwater-dependent vegetations, the ecohydrological study is being carried out. Additional measures for rewetting in the Mechelse Heide, Ziepbeekvallei, Neerharerheide and Asbeek Habitats Directive area are also being investigated in order to achieve a climate-robust system. The aim of the study is to investigate the impact on groundwater levels and the environmental conditions resulting from increases in the level of the lake Kikbeek and hydrological restoration measures in the Mechelse Heide, Ziepbeek, Neerharerheide and Asbeek. This should…

Show full description

… lead to maximising the restoration and maintenance of groundwater-dependent vegetation. The aim is to achieve climate-robust system restoration, without hypothesizing the critical infrastructure (such as the E314 motorway) and the long-term stability of the Berg quarry and the Kikbeekplas. The preparation of hydrological and ecological model predictions should serve to investigate scenarios for level rise in the lake Kikbeek and to develop and evaluate the development of wet nature in the Mechelse Heide Habitats Directive area.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.

Contract

BuyerVlaamse Overheid
TypeServices
Estimated valuevalue not published
Published20 August 2026
CategoryBusiness services · CPV 79311000

Who has won here before

CompanyAwardsPeriod
Sweco Belgium112024–2026
Krinkels102024–2026
A.B.O.G.102024–2026
WILLEMEN INFRA102024–2026
Anrob NV72024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202464
202567
202646

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 15 October at 14:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →