Supply of pre-collection and collection equipment
Fourniture d'équipement de pré-collecte et de collecte
France · Tilloy lès mofflaines · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 8 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (38 awards since 2017, spread over 17 companies). That is well below the sector norm (28%) — this buyer switches suppliers more often than others.n = 38 awards since 2017
- The median procedure drew 5 bids (37 procedures with a bid count); 0% ended with a single bidder. Sector: median 4 bids.n = 37
- 5% of awards went to companies from abroad (38 awards with a known winner country). Sector average: 5%.n = 38
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In France · Construction materials, 184 contracts went to foreign companies over the last 3 years (of 3,682 recorded awards) — mostly from Germany, Spain, Romania.
Submission language: FRA.
Typical field: median 4 (from 3,244 awards).
What the buyer is looking for
The supply of pre-collection, collection and washing equipment for the AVMS · This is the supply of overhead containers compatible with a crane collection equipped with a KINSHOFER gripping system. This lot includes the supply of air containers, their delivery and their manufacturer's warranty. It is a single-awarded framework agreement with order forms without a minimum amount and with a maximum amount of 1 000 000 €HT per period of 24 months. The framework agreement shall be concluded for a period of 24 months from the date of its notification to the holder. It may be tacitly renewed for a period of 24 months. The maximum duration of a framework agreement is 48 months. · Provision of a complete F90 robotic collection solution. This lot includes the supply of aerial containers, an F90 robotic collection vehicle, a washing box and the provision of delivery, commissioning, user training,…
Show full description
… maintenance and technical assistance. It also includes the deployment of a smart collection monitoring solution. It is a single-awarded framework agreement with order forms without a minimum amount and with a maximum amount of EUR 1 750 000 (HT) per 24-month period. The framework agreement shall be concluded for a period of 24 months from the date of its notification to the holder. It may be tacitly renewed for a period of 24 months. The maximum duration of a framework agreement is 48 months.
What you must prove — eligibility criteria
Les conditions de participation sont les suivantes : Les candidats devront produire les documents et renseignements permettant d'apprécier leur situation juridique, leur capacité économique et financière ainsi que leurs capacités techniques et professionnelles… ▸▾
Les conditions de participation sont les suivantes : Les candidats devront produire les documents et renseignements permettant d'apprécier leur situation juridique, leur capacité économique et financière ainsi que leurs capacités techniques et professionnelles… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| COLLECTES VALORISATION ENERGIE DECHETS (COVED SAS) | 1 | 2026 |
| SAS LAFLUTTE | 1 | 2026 |
| ILLICO SAS | 1 | 2026 |
| VANHEEDE ENVIRONNEMENT | 1 | 2026 |
| PAPREC ENERGIES OPERATIONS | 1 | 2026 |
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.