DNS - Dodávky osobních ochranných pracovních prostředků
Czechia · Praha · how to bid here →
Your path to submission
- Deadline: 31 December 2029 at 10:00 — 1185 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (81 awards, most recently January 2026) — by that rhythm the next award was due around June 2026. The last award went to Blue Fox Plzeň s.r.o..n = 81
- 56% of this buyer's awards went to companies that had already won here before (3,735 awards since 2013, spread over 399 companies). That is well below the sector norm (72%) — this buyer switches suppliers more often than others.n = 3,735 awards since 2013
- The award came in at a median 55% of the estimated value (301 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 70%.n = 301
- The median procedure drew 2 bids (3,177 procedures with a bid count); 41% ended with a single bidder. Sector: median 2 bids.n = 3,177
- 16% of awards went to companies from abroad (3,735 awards with a known winner country). Sector average: 20%.n = 3,735
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Czechia · Clothing & footwear, 104 contracts went to foreign companies over the last 3 years (of 1,237 recorded awards) — mostly from Germany.
Typical field: median 5 (from 79 awards).
What the buyer is looking for
The subject of the tender is the supply of personal protective equipment: Protective equipment; Protective face masks; Protective headgear; Protective helmets; Protective footwear; Protective goggles; Protective and safety clothing; Protective overcoats and raincoats; Protective socks and hosiery; Protective shirts and trousers
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Iveco Czech Republic, a. s. | 59 | 2019–2026 |
| BREMA, spol. s r.o. | 49 | 2016–2026 |
| PRAGOIMEX a.s. | 41 | 2019–2026 |
| OTIS a.s. | 34 | 2019–2023 |
| Elektroline a.s. | 33 | 2020–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.