SAD PR2025-11283 - Inst SAD Frut_Leg 3 anos
Portugal · Lisboa · how to bid here →
Your path to submission
- Deadline: 31 July 2028 at 17:00 — 667 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR, POR.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 95%.n = 7
- 65% of this buyer's awards went to companies that had already won here before (2,492 awards since 2017, spread over 665 companies). That is well above the sector norm (26%) — newcomers have a harder time here than elsewhere.n = 2,492 awards since 2017
- The median procedure drew just one bid (15 procedures with a bid count); 80% ended with a single bidder. Sector: median 4 bids.n = 15
- Not one of the 2,492 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 2,492
- 0% of the bids received came from other countries (7 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
Among 378 recorded awards in Portugal · Food & beverages over 3 years, no foreign winner yet — bidding here means being a pioneer.
Typical field: median 4 (from 354 awards).
What the buyer is looking for
Lot 1 · Lot 2 · Lot 3 · Lot 4 · Lot 5 · Lot 6 · Lot 7 · Lot 8 · Lot 9 · Lot 10 · Lot 11 · Lot 12 · Lot 13 · Lot 14 · Lot 15 · Lot 16
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Portuguese.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| GETINGE GROUP PORTUGAL UNIPESSOAL,LDA (MAQUET) | 42 | 2017–2026 |
| NeoValor | 39 | 2019–2026 |
| ERTES Sociedade de Representações Tecnicas Lda | 28 | 2019–2026 |
| CCEnergia, Lda. | 27 | 2018–2025 |
| Schneider Electric Portugal | 25 | 2017–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.