Dynamic Purchasing System for Minor Building Works — Tradespersons
Ireland · Killarney · how to bid here →
Your path to submission
- Deadline: 20 September 2029 at 15:00 — 1083 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG, ENG, ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 118 bids (167 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 167
- 12% of this buyer's awards went to companies that had already won here before (167 awards since 2019, spread over 140 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 167 awards since 2019
- 2% of awards went to companies from abroad (167 awards with a known winner country). Sector average: 2%.n = 167
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Ireland · Construction work, 128 contracts went to foreign companies over the last 3 years (of 9,857 recorded awards) — mostly from United Kingdom, Greece, Germany.
Typical field: median 118 (from 148 awards).
What the buyer is looking for
The Local Government Operational Procurement Centre (LGOPC), acting as a central purchasing body under the auspices of Kerry County Council, is coordinating the establishment of a Dynamic Purchasing System of Economic Operators for Minor Building Works — Tradespersons on behalf of contracting authorities. The contracting authorities eligible to take part are listed in the Instructions Document. · Electrical works. · Plumbing works. · Renewable energy systems and ancillary works.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Moneydarragh Construction Ltd | 3 | 2019–2026 |
| MCE Contract Services Ltd | 2 | 2025–2026 |
| O'Kelly Brothers Civil Engineering Company Ltd. | 2 | 2025–2026 |
| Rennicks Signs Ireland Ltd | 2 | 2019–2023 |
| Barnmore Demolition and Civil Engineering Ltd | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.