DIS - Tekniska konsulttjänster
Sweden · Luleå · how to bid here →
Your path to submission
- Deadline: 29 August 2028 — 693 days left. The source says 00:00. That means either only the day is known, or the deadline ends at midnight at the START of that day. To be safe, plan to submit by the day before.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 4 bids (170 procedures with a bid count); 13% ended with a single bidder. Sector: median 9 bids.n = 170
- 0% of this buyer's awards went to companies that had already won here before (183 awards since 2017, spread over 34 companies). That is well below the sector norm (15%) — this buyer switches suppliers more often than others.n = 183 awards since 2017
- 10% of awards went to companies from abroad (183 awards with a known winner country). Sector average: 10%.n = 183
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Sweden · Architecture & engineering, 69 contracts went to foreign companies over the last 3 years (of 999 recorded awards) — mostly from Finland, Germany, Poland.
Submission language: SWE.
Typical field: median 36 (from 14 awards).
What the buyer is looking for
Region Norrbotten invites you to apply to participate in a dynamic purchasing system (subsequently the Purchasing System) - Technical Consultancy Services. The consulting assignments in this Purchasing System may include different areas such as Architect, Land Building / Geotechnician, Building Design, Plumbing, EL, Medical Gases, Control and Supervision, Energy, Fire, Acoustics, Moisture, Sprinkler, Environment, Consultancy, Project Management, Control Manager, Inspection Services, Construction Manager.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VENTILATIONSFIRMA IM AB | 1 | 2023 |
| Schenker AB | 1 | 2026 |
| Infjärdens Värme AB | 1 | 2023 |
| HÖ Allbygg Aktiebolag | 1 | 2023 |
| Granitor Electro Aktiebolag | 1 | 2023 |