2.2.1 SUPPLIES OF WORK AND PROTECTIVE CLOTHING AND FOOTWEAR, INCLUDING HEALTH AND SAFETY ARTICLES
2.2.1 DOSTAWY UBRAŃ I OBUWIA ROBOCZYCH I OCHRONNYCH, W TYM ARTYKUŁÓW BHP
Poland · Nowy Dwór Mazowiecki · how to bid here →
Your path to submission
- Deadline: 31 December at 08:00 — 88 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 15% of this buyer's awards went to companies that had already won here before (371 awards since 2017, spread over 93 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 371 awards since 2017
- 15% of awards went to companies from abroad (371 awards with a known winner country). Sector average: 1%.n = 371
- The median procedure drew 2 bids (317 procedures with a bid count); 35% ended with a single bidder. Sector: median 3 bids.n = 317
- 75% of the bids received came from small and medium-sized enterprises (18 procedures with a bid mix). Sector: 92%.n = 18
- 0% of the bids received came from other countries (18 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Clothing & footwear, 9 contracts went to foreign companies over the last 3 years (of 5,779 recorded awards).
Submission language: POL.
Typical field: median 3 (from 1,005 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (PL).
Show original description (PL)
Dostawy ubrań i obuwia roboczych i ochronnych
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DP Tech Dariusz Podbielski | 18 | 2021–2026 |
| Unimot Energia i Gaz Sp. z o.o. | 5 | 2024–2026 |
| Zakład Budowlany - Stanisław Andrysiewicz | 5 | 2024–2025 |
| VOLKSWAGEN FINANCIAL SERVICES POLSKA Sp. z o.o. | 4 | 2024–2025 |
| Zakład Budowlany – Stanisław Andrysiewicz | 4 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.