Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction supervision for the construction" Reconstruction of the manor house, revitalization of the J.B. Mágina park and reconstruction of St. James's Square in Dubnica nad Váhom"

Stavebný dozor pre stavbu“ Rekonštrukcia kaštieľa, revitalizácia parku J.B. Magina a prestavba Námestia sv. Jakuba v Dubnici nad Váhom" — original title

SKSlovakia · Dubnica nad VáhomBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 12 November at 10:00 — 11 days left.
  2. You submit on ÚVO / EVO — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is the performance of construction supervision during the implementation of the construction: ‘Reconstruction of the manor house, revitalisation of the J.B. Mágina Park and reconstruction of St. Jakuba in Dubnica nad Váhom’ and ‘Revitalisation and increase of attractiveness of Dubnica manor house for the development of tourism’ ,, located in the village Dubnica nad Váhom. The properties are owned by the City of Dubnica nad Váhom, Bratislavská 434/9, 018 41 Dubnica nad Váhom. These are works on the reconstruction of the manor house - East Wing, restoration of the roof, facades, including the filling of windows, atrium, remediation of the space under the vaults, revitalization of the J.B.Mágina park – paths and lighting, and reconstruction of the space of St. Peter's Square. Jacob. Investment costs for the implementation of the work – Part 1 ‘Reconstruction of…

Show full description

… the manor house, revitalisation of J.B. Mágina Park and reconstruction of St. Peter's Square Jakuba v Dubnica nad Váhom’ is EUR 1 999 147.08 net of VAT within the meaning of the works contract. The estimated value of the contract for the 2nd part of the work from the project ‘Revitalisation and increase of attractiveness of Dubnický manor house for tourism development’ ,, which is in the pre-procurement stage, is €325,000.00 excl. VAT. The performance of construction supervision includes, in particular, the inspection of the implementation of construction works and technological equipment in accordance with the project documentation, the contract for work, the applicable technical standards and legal regulations, the quality control of the works performed and the built-in materials, participation in inspection days, the inspection of the inventories of the works performed and the contractor's invoicing, the drawing up of records, the provision of cooperation in change procedures, the inspection of the elimination of deficiencies and cooperation in the handover and takeover of the construction and the approval procedure. The performance of construction supervision will be provided on the basis of hourly rates of individual activities, not in the form of a flat price. The offered price will consist of the sum of hourly rates and other items according to the actual range of services provided. For the purposes of processing and comparing tenders, the contracting authority shall indicate an indicative expected scope of construction supervision, namely 400 hours during the construction and an indicative number of 100 construction trips. The above scope is indicative and does not constitute a binding scope of performance, it serves exclusively to ensure the comparability of offers. The offered price for the performance of construction supervision must consist of: • the hourly rate for carrying out construction supervision on the site, • the hourly rate or method of accounting for administrative activities, • the price for drawing up minutes and inspection records, • the method of accounting for transport, • the hourly rates of other professionals or professionals, if necessary. A more detailed description of the subject-matter of the contract is provided in the draft Mandate Contract – Annex 1 in these procurement documents.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated value€20,000
Published30 Oct 2026
ProcedureIný jednofázový postup

Type of service

71 · Architecture & engineering
CPV 71520000

Clement What the numbers say about this buyer

  • 5% of this buyer's awards went to companies that had already won here before (23 awards since 2018, spread over 3 companies). That is well below the sector norm (37%) — this buyer switches suppliers more often than others.n = 23 awards since 2018
  • 30% of awards went to companies from abroad (23 awards with a known winner country). Sector average: 13%.n = 23
  • The median procedure drew 3 bids (17 procedures with a bid count); 0% ended with a single bidder. Sector: median 4 bids.n = 17
  • 0% of the bids received came from other countries (5 procedures with a bid mix) — all bidders, not just the winners. Sector: 4%.n = 5
  • Across 3 procedures with structured selection criteria, this buyer most often required: Environmental management (3 of 3), References: works (3 of 3), Staff qualifications (3 of 3), Financial ratio required (3 of 3).n = 3

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ŠPORTFINAL s. r. o.22024
DAG SLOVAKIA, a. s.12025
BOISE s. r. o.12026
H B H , a.s.12025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Thursday 12 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 780 completed awards — not a statement about this procedure.)

This procedure allows 13 days between publication and deadline — typical in this country is 30 (median of 773 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Slovakia · Architecture & engineering, 27 contracts went to foreign companies over the last 3 years (of 771 recorded awards) — mostly from Czechia, Sweden, Germany.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ÚVO / EVO. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ÚVO / EVO before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now