Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Reduction of the energy intensity of the building Cultural HOUSE In the village of ordník

Zníženie energetickej náročnosti budovy kultúrny dom v obci rudník — original title

SKSlovakia · RudníkBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 6 November at 10:00 — 5 days left.
  2. You submit on ÚVO / EVO — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is to reduce the energy intensity of the building of the Cultural House in the village of Rudník. The scope of the restoration includes insulation of the perimeter shell, roof space in the non-residential attic of the gable roof, insulation of the roof structure in the countertop roofs, insulation of the ceiling structure above 1.PP - from the basement side, replacement of the roof covering, replacement of filling holes, replacement of plumbing elements, restoration of steel and locksmith elements (columns, railings), modification of the external staircase, replacement of the entire wiring and application of forced ventilation, pressure grouting of masonry to remove moisture in the perimeter walls. The building of the cultural house consists of several parts. For more information, please refer to the procurement documents.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerObec Rudník
TypeWorks
Estimated value€948,439
Published26 Oct 2026
ProcedureIný jednofázový postup
Place of performanceRudník

Type of service

45 · Construction work
CPV 45000000
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Contracting authority contact

·
Deadline — Friday 6 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,153 completed awards — not a statement about this procedure.)

This procedure allows 11 days between publication and deadline — typical in this country is 30 (median of 773 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ÚVO / EVO. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via ÚVO / EVO before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now