How to bid in this country: portals, deadlines, thresholds →
M1320 through the stream Bystrianka in the village Podbrezová
M1320 cez potok Bystrianka v obci Podbrezová — original title
Your path to submission
- Deadline: 23 November at 10:00 — 22 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the reconstruction of the bridge, which solves the very poor construction - technical condition of the bridge object. The project deals with the spatial arrangement of the communication, reconstruction of the bridge, modification of the stream and transhipment of the Telekom cable. The reconstruction of the bridge consists of two stages. The bridge is single-field from prestressed beams of the Vloššák type. The number of beams is 10 pieces, the length is 17.40 m. The bridge has 2 concrete supports of height 1.8 m. The vozovka on the bridge is resinous. The free width of the bridge is 10 m and the width between the edgings is 8 m. The bridge does not have bridge conclusions. The beams are stored on a layer of cardboard. As part of the reconstruction of the bridge, a connecting board will be built and the support and bar prefabricates will be monolithicized.…
Show full description
… As part of the reconstruction, a complete replacement of the structural layers of the road and the replacement of the road cover are considered. Road communication is two-lane, directionally undivided. The roadsides shall be adjusted and guides fitted. The spatial arrangement of the road at the crossing point with the brook in cum. km 64,161 will correspond to the width arrangement of the I. class I/72 road in width category C 9,5 with a design speed of 50 km/h. The drainage of the bridge is solved by the longitudinal and transverse slope of the road. In the vicinity of the bridge, the modification of the stream by leveling the bottom of the trough is designed. The length of the proposed modification of the stream is 26.4 m. The modification of the slopes along the bridge supports will be made of stone paving laid in concrete with grouting. In the area of the future construction site there is a 3x Telekom notification cable, which will be translated within the construction. A detailed definition of the subject of the contract, including the technical specifications drawn up, is given mainly in Section 1.2 Description of the subject of the contract, Volume 1, Volume 4 Price part and Volume 5 Project documentation of tender documents.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (20 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to VIAKORP, s.r.o.n = 20
- 8% of this buyer's awards went to companies that had already won here before (167 awards since 2018, spread over 36 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 167 awards since 2018
- The median procedure drew 4 bids (145 procedures with a bid count); 16% ended with a single bidder. Sector: median 5 bids.n = 145
- The award came in at a median 72% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 22
- 89% of the bids received came from small and medium-sized enterprises (49 procedures with a bid mix). Sector: 79%.n = 49
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Eurovia SK, a.s. · 040 17 SK | 4 | 2024–2026 |
| DAQE Slovakia s.r.o. | 3 | 2024–2026 |
| Metrostav DS a.s. | 3 | 2025–2026 |
| DOPRAVOPROJEKT, a.s. | 3 | 2025–2026 |
| Doprastav, a.s. | 2 | 2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 20 completed awards — not a statement about this procedure.)
This procedure allows 27 days between publication and deadline — typical in this country is 30 (median of 773 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now