How to bid in this country: portals, deadlines, thresholds →
Zvolen - groove, ensuring longitudinal continuity and intermediation of concrete slip under the groove and the weir itself
Zvolen - hať, zabezpečenie pozdĺžnej kontinuity a spriechodnenie betónového sklzu pod haťou a samotnej hate — original title
Your path to submission
- Deadline: 3 November at 10:00 — 2 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
As part of the implementation of the subject of the contract, a large-capacity pool fishing line is designed, which will ensure the intermediation of three migration barriers – knapsack, concrete slippage and MVE Zvolen, which make it impossible for fish and other aquatic animals to pass from the lower part of the Hron stream to the higher one. The proposed fish pipeline will be located in close proximity to the existing MVE Zvolen. The fish pipeline will be located on the area between the MVE production facility and the left-hand Hron dam. Currently, the area concerned consists of open grassland, the Zvolen MVE area, the access road to the MVE and the retaining walls of the banks of the distribution reservoir and the waste channel. Construction will not significantly interfere with the main objects of the MVE. As part of the construction, it will also be necessary to deal with the…
Show full description
… relocation of existing underground lines led from the MVE building, the relocation of water pipes. There will also be an intervention on the access road leading from the canopy of the weir to the MVE area, where it will be necessary to build a bridge of the proposed fish pipeline. This bridge needs to be built as one of the first buildings to ensure access to the MVE area even during the construction of the fish rig. When building the inlet building, the reconstruction of the gabion wall of the partition reservoir will also be solved. The object of the fish dock will be protected by fencing and railings against the entry of unauthorized persons and as well as protection from falling. A more detailed specification of the subject-matter of the contract is given in Annex 1-1 to the tender specifications (Description), Annex 1-2 to the tender specifications (Project) and Annex 2 to the tender specifications (Contract).
Contract
Type of service
Clement What the numbers say about this buyer
- 7% of this buyer's awards went to companies that had already won here before (124 awards since 2017, spread over 33 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 124 awards since 2017
- The median procedure drew 2 bids (93 procedures with a bid count); 37% ended with a single bidder. Sector: median 5 bids.n = 93
- 35% of awards went to companies from abroad (124 awards with a known winner country). Sector average: 25%.n = 124
- 100% of the bids received came from small and medium-sized enterprises (41 procedures with a bid mix). Sector: 79%.n = 41
- The award came in at a median 83% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Zemplínska plavebná spoločnosť s.r.o. v skratke používané ako: ZPS s.r.o. | 4 | 2026 |
| Fair Facility s.r.o. | 2 | 2023–2024 |
| SLOVNAFT, a.s. | 2 | 2026 |
| Keller špeciálne zakladanie, spol. s r.o. | 2 | 2026 |
| GEOREM, s.r.o. | 2 | 2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 4 completed awards — not a statement about this procedure.)
This procedure allows 13 days between publication and deadline — typical in this country is 30 (median of 773 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now