M4056 through Čierny potok near the village Švermovo
M4056 cez Čierny potok pri obci Švermovo — original title
Your path to submission
- Deadline: 16 November at 10:00 — 15 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The purpose and goal of the entire construction action is to improve the structural and technical condition of the bridge building M4056 (Eng. No. 66-153), its smooth connection to the subsequent section of the road before and after the bridge, and also to increase the safety and fluidity of traffic in the addressed section on the I/66 road. The existing I/66 line at the bridge site is unsatisfactory from the point of view of the standards currently in force and from the point of view of safety. A slight adjustment of the directional and elevation lines of the I/66 route is therefore necessary. The purpose of the bridge building is to carry out traffic on the road I/66 over the brook Brezinka in the extravillage of the village Telgárt. The construction action in question will build a new bridge structure (SO201-00) and the original bridge structure will be demolished to the extent…
Show full description
… necessary. The subject of the contract is a comprehensive reconstruction of the original arch structure of the bridge in exchange for a new supporting structure (SO201-00), a new lower structure, a new foundation, the construction of new bridge accessories, the application of new bridge waterproofing, roadway, railings on the bridge and railings in front of and behind the bridge. New transition areas with transition plates in front of and behind the bridge will also be implemented. Landscaping of the bottom and slopes of the trough will be carried out at and under the bridge. To the extent necessary, the bed and slopes of the Brezinka stream will be cleaned, which will then be reinforced with quarry stone laid in concrete to protect the foundations of the lower bridge structure from water erosion. The position of the creek trough under the bridge will remain without significant change after reconstruction, the design fully respects the current directional and height lines of the creek trough. Object 101-00 solves the reconstruction of the road in front of and behind this bridge. The purpose and objective of this IB is to modify the downstream section of the road before and after the proposed bridge. The 101-00 also includes a slight adjustment of the directional and elevation lines of the route. As part of the construction work, the road width will be adjusted according to the applicable STN. Structural layers will be replaced throughout the treated section. Based on the main inspection of 16.04.2026, the construction and technical condition of the bridge was evaluated by stage VII. – emergency. The breakdown of the building by object is designed as follows: SO 101-00 – Modification of the road I/66 SO 201-00 – Reconstruction of the bridge M4056 Detailed definition of the subject-matter of the contract, including the technical specifications drawn up, is given mainly in Part 1.2 Description of the subject-matter of the contract, Volume 1, Volume 4 Price part and Volume 5 Project documentation of tender documents.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (20 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to VIAKORP, s.r.o.n = 20
- 8% of this buyer's awards went to companies that had already won here before (167 awards since 2018, spread over 36 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 167 awards since 2018
- The median procedure drew 4 bids (145 procedures with a bid count); 16% ended with a single bidder. Sector: median 5 bids.n = 145
- The award came in at a median 72% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 22
- 89% of the bids received came from small and medium-sized enterprises (49 procedures with a bid mix). Sector: 79%.n = 49
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Eurovia SK, a.s. · 040 17 SK | 4 | 2024–2026 |
| DAQE Slovakia s.r.o. | 3 | 2024–2026 |
| Metrostav DS a.s. | 3 | 2025–2026 |
| DOPRAVOPROJEKT, a.s. | 3 | 2025–2026 |
| Doprastav, a.s. | 2 | 2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 20 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 30 (median of 773 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now