How to bid in this country: portals, deadlines, thresholds →
Restoration of Reduta SNV, reconstruction of roof, roof truss and attic and insulation” /The jewel of Spiš culture on the way to preserving its authentic value – Restoration of the Reduta NKP in Spišská Nová Ves/
Obnova Reduty SNV, rekonštrukcia strechy, krovu a podkrovia a zateplenie“ /Klenot kultúry Spiša na ceste k zachovaniu svojej autentickej hodnoty – obnova NKP Reduta v Spišskej Novej Vsi/ — original title
Your path to submission
- Deadline: 6 November at 09:00 — 5 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the Restoration of Reduta SNV, which consists of the reconstruction of the roof, truss and attic and insulation, which does not substantially change the appearance of the building. Reduta is in the monument zone. The building is a national cultural monument of the NKP. During maintenance work and building modifications, there will be repairs or replacement of roofing, art-craft, plumbing, lightning conductor elements. It will be repaired in some cases by adjusting the roof and floor contours. Roofing material changes on the roof - copper sheet for copper sheet. On the roof, the roofing material is repaired and changed locally. On roof F, J, the slope of the roof changes by about 3 degrees. Roofing with an attic structure is transformed into a new one consisting of a wooden attic of copper covering and roofing and flooring layers. The renovation solves the…
Show full description
… improvement of the heat-technical properties of a part of the building and is to be part of a comprehensive improvement of the energy properties of the building. Reduta is also a national cultural monument, so it is not possible to ensure a standard improvement of the heat-technical characteristics of the building. It is important to follow the procedures and instructions in the project documentation and study the details thoroughly. More detailed information is contained in the project documentation and the bill of quantities.
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 2 bids (6 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MILANKO spol. s r.o. | 1 | 2025 |
| ROST Group s.r.o. | 1 | 2024 |
| Brantner Nova, s.r.o. | 1 | 2024 |
| eurobus, a.s. | 1 | 2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,153 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 30 (median of 773 procedures). A normal window for this market.
Foreign bidders
In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now