Friedrich & ClementBETA

Repair and arrangement of lay-by on Highway A2 km 162+620, including earthworks, systems for collecting and evacuating water from the area adjacent to Highway A2 – DRDP Constanta

Refacere si amenajare podet pe Autostrada A2 km 162+620, inclusiv terasamente, sisteme de colectare si evacuare a apelor din zona aferenta Autostrazii A2 – DRDP Constanta

Romania · how to bid here →

Your path to submission

  1. Deadline: 13 October at 12:00 — 6 days left.
  2. You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (982 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to TRIPOL SISTEM CONSTRUCT.n = 982
  • The median procedure drew 3 bids (3,037 procedures with a bid count); 21% ended with a single bidder. Sector: median 5 bids.n = 3,037
  • 56% of this buyer's awards went to companies that had already won here before (4,145 awards since 2018, spread over 652 companies). 44% went to new names.n = 4,145 awards since 2018
  • The award came in at a median 92% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 66
  • 84% of the bids received came from small and medium-sized enterprises (1,913 procedures with a bid mix). Sector: 65%.n = 1,913

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Romania · Construction work, 165 contracts went to foreign companies over the last 3 years (of 78,814 recorded awards) — mostly from France, Italy, Germany.

Typical field: median 4 (from 804 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

Contract

BuyerCOMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published25 September 2026
CategoryConstruction work · CPV 45112500

Who has won here before

CompanyAwardsPeriod
LOIAL IMPEX812024–2026
OYL COMPANY HOLDING AG S.R.L.702024–2026
VESTA INVESTMENT662024–2026
SC EDIL CONTRACT SRL652024–2026
TRANSPOL SERVICE602024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

2024494
2025392
2026265

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 12:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on SICAP / e-licitatie. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →