Design, provision of equipment and materials, execution of works and integration of physical protection system for the waste treatment facility at CNE Cernavoda (CTRF), CR # 44148
Proiectare, asigurare echipamente si materiale, execuție lucrări si integrare sistem de protecție fizică aferent instalației de detritiere de la CNE Cernavoda (CTRF), CR # 44148
Romania · how to bid here →
Your path to submission
- Deadline: 3 December at 13:00 — 59 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (5 awards, most recently September 2025) — by that rhythm the next award was due around February 2026. The last award went to CONCELEX.n = 5
- The median procedure drew 2 bids (367 procedures with a bid count); 37% ended with a single bidder. Sector: median 5 bids.n = 367
- 46% of this buyer's awards went to companies that had already won here before (801 awards since 2019, spread over 245 companies). That is well below the sector norm (58%) — this buyer switches suppliers more often than others.n = 801 awards since 2019
- The award came in at a median 99% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 5
- 10% of awards went to companies from abroad (801 awards with a known winner country). Sector average: 0%.n = 801
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Romania · Construction work, 165 contracts went to foreign companies over the last 3 years (of 78,756 recorded awards) — mostly from France, Italy, Germany.
Typical field: median 5 (from 13,272 awards).
What the buyer is looking for
The procurement covers activities of design, execution of works, insurance of equipment and materials for the integration of the physical protection system related to the detrition installation, as well as personal training for the operation and maintenance of the physical protection system, based on a contract with a duration of 18 months. Tenderers may request clarifications regarding the tender documentation at least 12 days before the date set for the submission of tenders. The contracting authority will respond in a clear and complete manner to requests for clarifications within maximum 3 working days from the receipt of the request, no later than 6 days before the deadline for submission of tenders. The contracting authority will respond only to requests for clarifications sent by economic operators by the deadline set.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Romalexis | 26 | 2024–2025 |
| ACS SERVICE MEDEEA SRL | 26 | 2024–2025 |
| ENERGOTECH S.A. | 25 | 2024–2025 |
| SAWEXIM S.R.L. | 25 | 2024–2025 |
| S.C. NATALIGHT TRADE S.R.L. - | 25 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.