How to bid in this country: portals, deadlines, thresholds →
Vehicle-based methane & ethane measurement system
Fahrzeuggestütztes Methan- & Ethan-Messsystem — original title
Your path to submission
- Deadline for requests to participate: 6 November — 5 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender. The source gives only the day, no time of day — on the portal the deadline is usually in the morning. Check the exact time there before you plan.
- The submission point is stated in the notice (link on this page).
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
This specification describes the technical characteristics of a vehicle-based measurement system for the above-ground inspection of gas distribution networks. The measuring system shall be designed for the vehicle-based above-ground inspection of underground gas pipelines by means of atmospheric concentration and wind measurement. · The scope of services includes in particular: · - Measurement system including sensors for gas concentration, wind measurement, position determination, operating and data acquisition unit as well as required software. · - Vehicle integration into a vehicle provided by the client. · - Provision of data formats and interfaces for the further processing of driving data. · - Proofs, manufacturer's declarations, training as well as service and support services.
Contract
Type of service
Clement What the numbers say about this buyer
- 46% of this buyer's awards went to companies that had already won here before (92 awards since 2019, spread over 50 companies). 54% went to new names.n = 92 awards since 2019
- 69% of the bids received came from small and medium-sized enterprises (15 procedures with a bid mix). Sector: 43%.n = 15
- From notice to award takes a median 145 days here (34 procedures). Sector: 62 days.n = 34
- The median procedure drew 2 bids (66 procedures with a bid count); 47% ended with a single bidder. Sector: median 2 bids.n = 66
- Across 3 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (3 of 3), Trade register enrolment (3 of 3), Minimum annual headcount (2 of 3), Staff qualifications (2 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| GE Grid GmbH · Frankfurt am Main | 5 | 2025 |
| Trans4mation IT GmbH · Dresden | 4 | 2022–2025 |
| regiocom SE · Magdeburg | 4 | 2025–2026 |
| Siemens Energy Global GmbH & Co. KG | 4 | 2025 |
| Enseco GmbH · Magdeburg | 3 | 2022–2026 |
Tactics
When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 9,799 completed awards — not a statement about this procedure.)
This procedure allows 26 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Petroleum & fuels, 66 contracts went to foreign companies over the last 3 years (of 10,064 recorded awards) — mostly from Netherlands, Austria, United Kingdom.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now