How to bid in this country: portals, deadlines, thresholds →
Framework contract for assembly work for signalling and train protection technology 01.12.2026 – ...
Rahmenvertrag Montagearbeiten Signal- und Zugsicherungstechnik 01.12.2026 – … — original title
Your path to submission
- Deadline: 3 November at 11:00 — 2 days left.
- The submission point is stated in the notice (link on this page).
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Place of execution: 40231 Düsseldorf In the operating area of Rheinbahn AG. Rheinbahn AG intends to conclude the following framework agreement: The subject of the framework contract is assembly and disassembly work on our signalling and train protection systems, as well as on our switch controls (in this case, e.g. assembly of switch lock circuits and axle counters) including necessary cable and connection work as a framework contract.
Contract
Clement What the numbers say about this buyer
- 43% of this buyer's awards went to companies that had already won here before (15 awards since 2023, spread over 9 companies). 57% went to new names.n = 15 awards since 2023
- The median procedure drew 2 bids (15 procedures with a bid count); 40% ended with a single bidder. Country: median 3.1 bids.n = 15
- 7% of awards went to companies from abroad (15 awards with a known winner country). National average: 1%.n = 15
- Across 7 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (7 of 7), Professional liability insurance (6 of 7), Quality control by institutes (4 of 7), Average minimum annual turnover (4 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SPL Powerlines Germany GmbH · Forchheim | 3 | 2025 |
| krauth technology GmbH · Eberbach | 3 | 2025 |
| STRABAG AG Bereich Rheinland · Köln | 2 | 2025–2026 |
| INIT GmbH | 2 | 2026 |
| Wisag Elektrotechnik Nord-West GmbH & Co. KG · Bochum | 2 | 2026 |
Tactics
This procedure allows 26 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now