Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

3620_EU_241126 Drywall works

3620_EU_241126 Trockenbauarbeiten — original title

DEGermany · Stuttgart

Your path to submission

  1. Deadline: 24 November at 11:30 — 23 days left.
  2. You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

-Dry walls, small areas, individual rooms, -approx. 380m2. -Shaft walls approx. 460m2. -Dry construction ceilings HWL approx. 1.285m2. -GK ceilings smooth approx. 88m2. -GK ceiling perforated about 15m2.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuevalue not published
Published22 Oct 2026
ProcedureOpen procedure
Contract period8 Feb 2027 → 9 Oct 2027
Place of performance70439 Stuttgart Stammheim - Mitte

Tender documents at a glance

The essentials of the tender documents, read in seconds. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

The input text concerns an EU-wide public procurement procedure for construction services (Trockenbauarbeiten) for a new building complex “Jugendtreff und Kindertagesstätte” in Stuttgart, Germany. It is based on German procurement and construction contract law (VOB/A, VOB/B) and on forms of the German federal contract handbook (VHB). The country perspective is clearly German: it refers to German statutes (e.g. HwO, Einkommensteuergesetz, Landestariftreuegesetz Baden‑Württemberg, Wettbewerbsregistergesetz), German authorities (Vergabestelle der Landeshauptstadt Stuttgart, Vergabekammer Baden‑Württemberg), and EU law (Sanktionspaket gegen Russland, Verordnung (EU) Nr. 833/2014).

The text first sets out the general framework and participation conditions for the tender, such as that the procedure follows VOB/A section 2, that the offer must be submitted in German and electronically via the platform “meinauftrag.rib.de”, and that the official forms provided by the contracting authority must be used. It also specifies basic timelines, such as the deadline for submission of tenders (24.11.2026, 11:30), the bid validity period (60 days), and the deadline for requesting additional information (16.11.2026, 18:00). Furthermore, it outlines how bidders must raise any perceived ambiguities or errors in the documents before submission through bidder questions rather than informal cover letters.

Show the full summary (7 paragraphs)

Regarding what the bidder must submit and minimum qualification requirements, the text details, for example, Formblatt 216 “Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen”. With the offer, bidders must submit the Angebotsschreiben (FB 213 EU), the priced bill of quantities (Leistungsverzeichnis mit Preisen), and, if applicable, forms like 224 (Lohngleitklausel), 233 (Nachunternehmerleistungen), 234 (Bieter-/Arbeitsgemeinschaft), 235 (Leistungen/Kapazitäten anderer Unternehmen), 248 (Holzprodukte) and any required Instandhaltungsvertrag. On request, further documents such as Eigenerklärung zur Eignung (FB 124 or EEE), PQ-number, at least three references from the last five years, evidence of average staff numbers, trade registration, Handwerkskarte/Handelsregisterauszug, tax and social fund clearance certificates, BG-uncertainty/insurance confirmations, and product data sheets must be provided. As such, turnover data for the last three financial years and comparable reference projects are demanded via the Eigenerklärung, but the notice explicitly states that there are “keine” concrete, project-specific minimum thresholds for turnover.

Concerning the scope of the contract – what, how much, where, when – the documents describe, for instance, that the performance concerns Trockenbauarbeiten for the Neubau eines Gebäudekomplexes “Jugendtreff und Kindertagesstätte Asperger Str. 41–43” in 70439 Stuttgart‑Stammheim. The precise quantities and technical specifications are contained in the Leistungsverzeichnis (including example positions for walls, shafts and suspended ceilings). Timewise, the Besondere Vertragsbedingungen (FB 214) stipulate that works start on 08.02.2027 and must be completed (abnahmereif) by 09.10.2027; these dates and any single deadlines in the Bauzeitenplan are declared Vertragsfristen. Furthermore, the contract location is tied to Stuttgart, with the Vergabestelle and project server being provided by the City, and all communication and documentation to be handled electronically as specified.

As for award criteria and weighting, the Aufforderung zur Angebotsabgabe (FB 211 EU) explains, for example, that the main Zuschlagskriterium is the price, determined from the “Wertungssumme” of the offer after recalculation of the total, including unconditional discounts, potential effects from Lohngleitklausel, and any maintenance offers. No multi-criteria weighting is described for this tender beyond a special 15 % “Bonus” for offers from recognised Werkstätten für Behinderte: their offers receive a 15 % bonus in the price comparison, and if such an offer is equally economical, it gets the award. The selection criteria in the notice also mention qualitative “Eignungskriterien” such as tools/equipment, share of subcontracting, turnover and registration in relevant professional registers, but these serve to assess suitability rather than contribute to a separate points-based award weighting.

The text also outlines risks and special conditions, such as penalties, guarantees, subcontracting, bid validity, question deadlines and procedural constraints. For example, Besondere Vertragsbedingungen specify contractual penalties (Vertragsstrafe) for each day of delay in meeting contractual deadlines, capped at 5 % of the net final account sum, and refer to VOB/B § 11. Financial securities include a 5 % contract performance security (if the net contract exceeds 250,000 €) and a 3 % security for defects claims, typically provided as self-contained guarantees using forms 421 (Vertragserfüllungsbürgschaft) and 422 (Mängelansprüchebürgschaft). Subcontracting is strictly controlled: all intended Nachunternehmerleistungen must be specified by exact LV‑OZ in FB 233/235, with vague entries such as “teilweise Montagearbeiten” being prohibited, and for “Eignungsleihe” the other companies must jointly and severally assume liability, documented via FB 236. The offer must remain valid for 60 days; missing documents requested with the offer can be submitted later under § 16a EU VOB/A at the buyer’s discretion. There is a clear deadline and procedure for asking questions (at least 3 working days before start of the answer period under § 12a EU VOB/A). Site visit requirements are not explicitly mentioned in the extracted text.

Finally, the documents address contradictions or corrections, indicating which statements apply. For example, the Teilnahmebedingungen (212 EU) extensively describe the handling of Nebenangebote, yet the Aufforderung zur Angebotsabgabe (211 EU) explicitly contains alternative clauses: either “Nebenangebote sind nicht zugelassen” or “Nebenangebote sind zugelassen …”. For this specific tender the text clearly marks “Nebenangebote sind nicht zugelassen; Nummer 4 der Teilnahmebedingungen gilt nicht”, meaning that the prohibition in 211 EU overrides the general rules in 212 EU. Similarly, the Besondere Vertragsbedingungen (214) state both “Auf Sicherheit für die Vertragserfüllung wird verzichtet” and, in the next sentence, the obligation to provide 5 % security if the contract sum exceeds 250,000 €; these are structured alternatives, and the ticked version for this contract is the one requiring security (as confirmed by the TED notice text). Where bidders find perceived inconsistencies, they are instructed, such as in the Hinweise der Vergabestelle, to raise formal bidder questions before submission rather than explaining deviations in a cover letter, because unilateral clarifications could be treated as unauthorised changes to tender documents and thus lead to exclusion under § 13 and § 16 VOB/A.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 25/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration
·
Deadline — Tuesday 24 November at 11:30

Tactics

This procedure allows 33 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.

Foreign bidders

In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on RIB meinauftrag.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via RIB meinauftrag.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now