Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

4720_EU_031226 Bathing installations

4720_EU_031226 Badetechnische Anlagen — original title

DEGermany · Stuttgart

Your path to submission

  1. Deadline: 3 December at 11:30 — 32 days left.
  2. You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Bathing water technology according to DIN 19643 with pressure filter boiler up to D = 2.40 m with the following treatment cycles: - Vario basin: approx. 250 m3/h - multipurpose pool: 200 m3/h - Plans...

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published22 Oct 2026
ProcedureOpen procedure
Contract period29 Nov 2027 → 21 Dec 2029
Place of performance70437 Stuttgart

Tender documents at a glance

The essentials of the tender documents, read in seconds. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

The input text concerns an EU-wide public tender for “Badetechnische Anlagen” (pool technology installations) for the Neubau Hallenbad Zuffenhausen in Stuttgart, Germany. It is based on the German procurement and construction contract rules (VOB/A, VOB/B) and standard federal forms (VHB Bund) with supplements by the Landeshauptstadt Stuttgart. The country explicitly mentioned and whose legal framework is applied is Germany (including Baden-Württemberg-specific tariff compliance rules and references to German authorities such as the Vergabekammer Baden-Württemberg).

The text specifies in detail what bidders must submit with their offers and which minimum qualification requirements apply. Such as: the use of standard forms (Formblatt 213 EU – Angebotsschreiben, 216 – Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen, 124 – Eigenerklärung zur Eignung or EEE, 221/222 – Preisermittlung, 223 – Aufgliederung der Einheitspreise, 233 – Nachunternehmerleistungen, 234 – Bietergemeinschaft, 235 – Kapazitäten anderer Unternehmen, 236 – Verpflichtungserklärung anderer Unternehmen, 248 – Erklärung Holzprodukte). With the offer, the bidder must at least submit the completed Angebotsschreiben, the priced Leistungsverzeichnis and any required product data and minimum-requirement evidence (e.g. Datenblätter, Muster). On request, further company-related documents must be provided, such as references of the last five years (at least three), annual turnover for the last three years (comparable services), staff numbers by wage group, PQ number or Eigenerklärung zur Eignung, Gewerbeanmeldung/Handelsregister/Handwerksrolle, tax, social fund and Berufsgenossenschaft clearance certificates, Freistellungsbescheinigung § 48b EStG, as well as Urkalkulation and product data sheets. Minimum requirements are described but, for example regarding turnover, “keine konkreten auftragsbezogenen Mindestanforderungen” are stated in the notice; however, the bidder must show overall suitability and, if non-prequalified, later confirm the self-declarations with official certificates.

Show the full summary (6 paragraphs)

The scope of the contract is the execution of pool-technical installations in the new indoor swimming pool in Stuttgart-Zuffenhausen (NUTS DE111). Such as: delivery and installation of filter systems, pumps, pipes (e.g. PE-Rohr DN 32/200, PE-Bogen), valves, water attractions, control technology, sensors, and associated site logistics and coordination duties. The Leistungsverzeichnis excerpt shows quantities and item descriptions (e.g. “Filterbehälter D = 2400 mm”, “Rohwasserspeicher”, “Marmorkiesbehälter 180 ltr”). The place of performance is the construction site / project office of the client’s supervision. The execution period is set by Besondere Vertragsbedingungen: start around KW 29/2027 (with concrete dates and reference to a Bauzeitenplan); certain information (e.g. Rohbau-/Fundamentangaben) must be delivered within defined weeks after award. Completion (abnahmereife Fertigstellung) is dated (e.g. 21.12.2029), and these dates, along with single contractual milestones in the construction schedule, are declared contractual deadlines. Offers must be submitted electronically by 03/12/2026, 11:30, must remain valid for 81 days, and questions must be posed via the platform or email in time (at the latest three working days before the start of the formal answer period, with a general TED deadline 23/11/2026 18:00).

Award criteria and weighting are described in the Aufforderung zur Angebotsabgabe (211 EU). Such as: the main award criterion is price; the “Wertungssumme” is determined from the recalculated offer sum considering unconditional discounts, any wage adjustment (Lohngleitklausel), and maintenance offers. Price reductions entered directly in the GAEB file are automatically included in the total and the price evaluation. Additional award criteria can be set via a separate Zuschlagskriterien form, but in the text the explicit weighting beyond price is not detailed. A specific rule applies for workshops for disabled persons: their offers get a 15% bonus in the evaluation of economic efficiency; if their offer is as economical as another, the contract is awarded to the workshop for disabled persons, provided proof of this status is submitted with the offer.

Risks and special conditions are extensively regulated. Such as: contractual penalties (Vertragsstrafen) under § 11 VOB/B for exceeding contractual deadlines, calculated per working day of delay based on a percentage of the net final invoice amount, limited to 5% total. Tariff compliance and minimum wage obligations under the Baden-Württemberg Landestariftreuegesetz (LTMG) and AEntG/MiLoG are enforced through mandatory commitment declarations and contractual penalties (up to 1% of contract value per violation, cumulative up to 5%). Financial securities: if the net contract sum is at least 250,000 EUR, a performance security of 5% of the gross contract sum and a defects liability security of 3% of the sum of interim payments at acceptance are required, typically via the client’s standard guarantee forms (Vertragserfüllungsbürgschaft, Mängelansprüchebürgschaft). Subcontracting is closely controlled; bidders must clearly declare which items are executed by subcontractors (Form 233) and by other companies whose capacities are used (Form 235 and 236, with joint liability for financial capacity borrowing). Mixed calculations and undisclosed shifting of unit prices between positions are prohibited and lead to exclusion. Bidders must adhere to electronic submission, electronic invoicing, and may have their Urkalkulation opened for price checking. Competitive risks are addressed by an explicit 15% lump-sum damages clause in case of proven anticompetitive collusion. There is no requirement to perform in protected employment programmes, and no dynamic purchasing system or framework agreement is used. Site visit is not explicitly mentioned in the excerpts, but extensive rules on participation in site meetings, logistics (“Just in Time” deliveries), weekly 14-day work forecast, prohibition or restriction of advertising on site, and daily site reports are stated in the Leistungsverzeichnis and Further Special Conditions.

Contradictions or corrections within the documents are addressed by clear hierarchy and instructions. Such as: if bidders consider the tender documents contradictory, erroneous or unclear, they must alert the contracting authority in text form before submission (212 EU Nr. 1). Clarifying notes in a cover letter to the offer are discouraged because they could be interpreted as changes to the tender documents and result in exclusion under § 13/§ 16 VOB/A. In case of differing statements on side offers (Nebenangebote), 211 EU explicitly determines whether they are allowed; if 6.1 states “Nebenangebote sind nicht zugelassen”, the general rules in 212 EU Nr. 4 do not apply. On securities, the Besondere Vertragsbedingungen first note a waiver and then, in the same section, re-impose securities above 250,000 EUR; the operative rule is the conditional requirement: no security below 250,000 EUR, mandatory security above this threshold. Where different documents refer to advertising on site (LV says “untersagt”, BVB say “nur nach Zustimmung”), the later “Weitere Besondere Vertragsbedingungen” clarify that advertising is only allowed with prior consent, which effectively refines the general prohibition. In allocation of evaluation discounts, the rule in the participation conditions (212 EU, Nachlässe in GAEB plus only unconditional percentage discounts in Form 213 EU are valued) governs; conditional price reductions or those not declared at the prescribed place remain contract content but are not taken into account in the award decision.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 25/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration
·
Deadline — Thursday 3 December at 11:30

Tactics

This procedure allows 42 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on RIB meinauftrag.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via RIB meinauftrag.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now