Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

ZV-GL-26-1152000-4121.06 Purchase of a rinsing container for the state accommodation Seeth

ZV-GL-26-1152000-4121.06 Kauf eines Spülcontainers für die Landesunterkunft Seeth — original title

DEGermany · Kiel

Your path to submission

  1. Deadline: 16 November at 08:30 — 15 days left.
  2. You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeServices
Estimated valuevalue not published
Published13 Oct 2026
ProcedureOpen procedure
Place of performance25878 Seeth

Clement What the numbers say about this buyer

  • 19% of this buyer's awards went to companies that had already won here before (94 awards since 2018, spread over 76 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 94 awards since 2018
  • The award came in at a median 45% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 86%.n = 8
  • The median procedure drew 2 bids (87 procedures with a bid count); 44% ended with a single bidder. Country: median 3.1 bids.n = 87
  • Not one of the 94 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 94
  • From notice to award takes a median 59 days here (5 procedures). Country: 86 days.n = 5

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, read in seconds. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

The input text concerns a public procurement procedure conducted by Gebäudemanagement Schleswig-Holstein AöR in Germany for the “Kauf eines Spülcontainers für die Landesunterkunft Seeth” (purchase of a dishwashing container). It is an EU‑type procedure under German procurement law (VgV/UVgO, GWB, WRegG) with references to EU sanctions regulations (Regulation (EU) 833/2014, 2022/576). The perspective is clearly that of a German public authority tendering a supply-and-service contract within the European Union framework.

Such as in the section “Anlage ‚Vorzulegende Nachweise‘”, the text specifies in detail what bidders must submit with their offer: the signed Angebotsschreiben (offer letter form) including declarations on exclusion grounds (§§ 123, 124, 128 GWB and self-cleaning per § 125 GWB), an own declaration that the Wettbewerbsregister has no negative entries, the specific Article 5k sanctions declaration (EU 833/2014 / 2022/576), a bidder information sheet (firm data, VAT ID, bank details), an own declaration of registration in the professional or commercial register, and at least one and up to three reference projects from the last three years using the provided reference form. Additional required proofs include the subcontractor declaration form (if applicable), a subcontractor commitment (Verpflichtungserklärung) for Eignungsleihe, an own declaration on existing or to‑be‑concluded Betriebshaftpflichtversicherung (liability insurance), technical data sheets for the offered container and equipment, and the fully completed Excel price sheet. All of these are minimum qualification and formal requirements; turnover is not mentioned explicitly, insurance and references are.

Show the full summary (6 paragraphs)

Such as in the “Angebotsaufforderung” and Bieterfragen, the scope of the contract is described as a turnkey delivery and installation of a 6‑m dishwashing container with band dishwasher, water treatment, grease separator, lifting unit, including relocation of existing cooling containers, all connection works, commissioning, functional testing, documentation, DGUV‑compliant electrical test protocols and staff training. The place of performance is the Landesunterkunft Seeth in Schleswig-Holstein, Germany. The time frame is clarified in the Q&A: execution period 01.02.–14.02.2027, with the container required to be fully operational by 14.02.2027, and handover/inbetriebnahme possibly on 15.02.2027. The contract type is a single lot (no lot-wise award); variants and multiple bids are not permitted; offers must be submitted electronically via the RIB e‑Vergabe platform by 16.11.2026, 08:30, and must remain binding for 45 days, with questions to be asked only in text form via e‑Vergabesystem/e‑mail by 09.11.2026, 23:59.

Such as in the sections on “Angebotswertung”, “Zuschlagskriterien” and the TED notice, the award criteria are purely price-based: the Zuschlagskriterium is “Preis” with a weighting of 100 %. The economically most advantageous tender is defined as the lowest net total price according to the price sheet (Gesamtsumme netto), with the evaluation price derived from the recalculated offer sum including unconditional percentage discounts noted in the designated field. There are no qualitative or technical scoring criteria; however, technical suitability is ensured via mandatory data sheets and minimum requirements in the specifications. Performance-related documents that affect economic evaluation cannot be requested after the deadline; only non-essential price items may be clarified if they do not change total price or ranking.

Such as in the “Zusätzliche Vertragsbedingungen”, Bieterfragen and Bewerbungsbedingungen, the documents outline key risks and special conditions: VOL/B (2003) plus GM.SH “Zusätzliche Allgemeine Vertragsbedingungen” are binding, and any bidder AGB lead to exclusion. There are explicit anti‑corruption and anti‑cartel clauses with contractual penalties (5 % of settlement sum for corruption-related offences, 15 % for proven anti-competitive agreements) and rights of termination under § 314 BGB. The 14.02.2027 completion date is a binding contractual deadline; while no liquidated damages are set, statutory delay rules apply, including possible compensation for documented extra costs such as disposable tableware. The authority may adjust the deadline reasonably if delays are attributable to itself, but not simply because of supplier lead times (these remain bidder risk). Subcontracting is regulated via the Verzeichnis der Unterauftragnehmerleistungen and mandatory commitment declarations; “pure suppliers” of standard components without on-site work are not treated as subcontractors (Q&A), whereas suppliers whose staff perform on‑site tasks (e.g. installation, commissioning, training) must be declared as Unterauftragnehmer. E‑invoicing in xRechnung format is mandatory, payments are electronic, and overpayments must be repaid with high default interest. No site visit is mentioned as required or offered.

Such as in the corrections found in the Bieterfragen, contradictions are explicitly resolved within the documents. For example, the initial specification mentioning “Mitte Februar 2026” for readiness is contradicted by the TED notice indicating performance in February 2027; the Q&A clarify that the binding requirement is readiness by 14.02.2027 (with handover by 15.02.2027). Another potential contradiction between Bewerbungsbedingungen (generic rules for Nebenangebote) and the Angebotsaufforderung (which states Nebenangebote sind nicht zugelassen) is resolved by the specific statement in the Aufforderung: for this procedure, alternative bids are not allowed, so the general Nebenangebote rules do not apply. Similarly, while the generic offer conditions mention possible paper or electronic submission options, the TED notice and instructions for electronic submission make clear that here only electronic submission via RIB is permitted; paper offers are invalid. Where discrepancies exist, the specific provisions in the Aufforderung, TED notice and Bieterfragen/Antworten for this tender prevail over generic template text.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 24/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Ingenieurgesellschaft Nordwest mbH42018–2026
ANWIKAR CONSULTANTS GmbH · Würzburg42025
SAP Deutschland SE & Co. KG · Walldorf32017–2022
Schweitzer Fachinformationen oHG · München32026
Steinmetz Briefumschläge GmbH & Co. KG · Schenefeld/Krs. Pinneberg32012–2020
From the recorded awards · regular winners know this buyer's requirements — that is your competition.
·
Deadline — Monday 16 November at 08:30

Tactics

This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on RIB meinauftrag.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via RIB meinauftrag.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now