G00357_2026 - SAFETY COORDINATION SERVICES DURING EXECUTION PHASE (CSE), LOT 1 AND WORK SUPERVISION SERVICES (DL) LOT 2 - WORKS FOR THE IMPLEMENTATION OF ACOUSTIC MITIGATION MEASURES PROVIDED IN THE FIRST FIVE-YEAR PERIOD OF THE NOISE CONTAINMENT AND REDUCTION PLAN - MACRO INTERVENTIONS NO. 05, 09, 10, 17, 18 AND 23.
G00357_2026 - SERVIZI DI COORDINAMENTO PER LA SICUREZZA IN FASE D'ESECUZIONE (CSE), LOTTO 1 E DI DIREZIONE LAVORI (DL) LOTTO 2 - LAVORI DI REALIZZAZIONE DEGLI INTERVENTI DI MITIGAZIONE ACUSTICA PREVISTI NEL PRIMO QUINQUENNIO DEL PIANO DI CONTENIMENTO E ABBATTIMENTO DEL RUMORE - MACRO INTERVENTI N. 05, 09, 10, 17, 18 E 23.
Italy · how to bid here →
Your path to submission
- Deadline: 3 November at 07:30 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ITA, ITA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 27% of this buyer's awards went to companies that had already won here before (393 awards since 2018, spread over 257 companies). 73% went to new names.n = 393 awards since 2018
- The median procedure drew 2 bids (201 procedures with a bid count); 42% ended with a single bidder. Country: median 1.1 bids.n = 201
- 1% of awards went to companies from abroad (393 awards with a known winner country). National average: 0%.n = 393
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Italy, 2,157 contracts went to foreign companies over the last 3 years (of 2,216,733 recorded awards) — mostly from France, Germany, Spain.
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (IT).
Show original description (IT)
Lotti: Servizio di Coordinamento della Sicurezza in esecuzione (CSE); Servizio di Direzione Lavori (DL)
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Italian.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| COSTRUZIONI GENERALI GIRARDINI SPA UNIPERSONALE | 5 | 2024–2026 |
| ASPIRECO S.R.L. | 5 | 2025 |
| IGSA SRL | 4 | 2025–2026 |
| AVR SPA | 4 | 2025–2026 |
| GIOVETTI SISTAM S.R.L. | 4 | 2026 |