Powołanie Inspektora Nadzoru Technicznego dla zadania aktualizacji i uzupełnienia bazy EGiB oraz opracowania dokumentacji technicznej obejmującego obręby w gminie Dąbie
Poland · Krosno Odrzańskie · how to bid here →
Your path to submission
- Deadline: 12 October at 09:00 — 8 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (72 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Okręgowe Przedsiębiorstwo Geodezyjno - Kartograficzne GEOMAP Sp. z o.o..n = 72
- 38% of this buyer's awards went to companies that had already won here before (362 awards since 2019, spread over 208 companies). 62% went to new names.n = 362 awards since 2019
- The median procedure drew 3 bids (35 procedures with a bid count); 9% ended with a single bidder. Sector: median 4 bids.n = 35
- Not one of the 362 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 362
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 3 (from 26 awards).
What the buyer is looking for
1. The subject of the contract is to perform the function of the Technical Supervision Inspector for the task of updating and supplementing the EGiB database and developing technical documentation, performed in accordance with the GIP and applicable law. The scope of the contract includes supervision and control over the implementation of the updates of the EGiB in RPM. Darkrooms, Dąbie 2. The subject of the contract is to perform the function of the Technical Supervision Inspector for the task of updating and supplementing the EGiB database and developing technical documentation, performed in accordance with the GIP and applicable law. The scope of the contract includes supervision and control over the implementation of the updates of the EGiB in RPM. Kosierz, Dąbie 3. The subject of the contract is to perform the function of the Technical Supervision Inspector for the task of updating…
Show full description
… and supplementing the EGiB database and developing technical documentation, performed in accordance with the GIP and applicable law. The scope of the contract includes supervision and control over the implementation of the updates of the EGiB in RPM. Lubiatów, Dąbie 4. The subject of the contract is to perform the function of the Technical Supervision Inspector for the task of updating and supplementing the EGiB database and developing technical documentation, performed in accordance with the GIP and applicable law. The scope of the contract includes supervision and control over the implementation of the updates of the EGiB in RPM. Połupin, Dąbie Municipality
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Rejon Budowy Dróg i Mostów w Krośnie Sp. z o.o. | 21 | 2021–2026 |
| STRABAG Sp. z o.o. | 12 | 2023–2026 |
| PRZEDSIĘBIORSTWO DROGOWE "KONTRAKT" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 9 | 2022–2026 |
| GEOPROFIL sp. z o.o. | 9 | 2025–2026 |
| Poczta Polska S.A. | 6 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.