Wykonanie robót budowlanych polegających na rozbudowie hangaru na terenie Bazy Szkoleniowej w Kalu w formule „zaprojektuj i wybuduj”
Poland · Legionowo · how to bid here →
Your path to submission
- Deadline: 19 October at 09:00 — 15 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (36 awards, most recently July 2026) — the next award is due around October 2026 by that rhythm. The last award went to SODAFAST Sp. z o.o..n = 36
- The award came in at a median 124% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 83%.n = 6
- The median procedure drew 3 bids (63 procedures with a bid count); 16% ended with a single bidder. Sector: median 5 bids.n = 63
- 37% of this buyer's awards went to companies that had already won here before (190 awards since 2021, spread over 120 companies). 63% went to new names.n = 190 awards since 2021
- Not one of the 190 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 190
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject of the contract is the execution of construction works consisting in the extension of the hangar on the premises of the Training Base in Kala, along with the execution of design documentation in the ‘design and build’ formula - Kal 34, 11-600 Węgorzewo. 2. The full scope of works is included in the Functional and Utility Programme, constituting Annex 1 to the ToR. 3. If it is necessary to submit a notification or other activities prior to the commencement of construction works referred to in the Construction Law Act of 7 July 1994 (Journal of Laws 2026, item 524), hereinafter referred to as the Construction Law Act, the Contractor will perform them under this contract. 4. The design must take into account the technical and functional parameters of the adopted material solutions and selected technologies. 5. The Ordering Party reserves the right to introduce modifications…
Show full description
… to the adopted design solutions. 6. The deadline for completing the complete project documentation together with obtaining the necessary opinions, agreements and, if necessary, submitting a notification or other activities preceding the start of construction works is up to 40 days from the date of conclusion of the contract, provided that the funds must be spent in the current financial year. 7. Execution of complete project documentation may not exceed PLN 49,136.00 (in words: forty-nine thousand one hundred thirty-six zlotys). 8. At the stage of preparing the design documentation, the Contractor is obliged to present the concept of the functional and usable layout of the building in order to obtain the Contracting Authority's approval. 9. Common Public Procurement Vocabulary (CPV) symbol: 45000000-7 for construction works, 45216100-5 for construction works for public order services, 45310000-3 for electrical installation works, 45400000-1 for completion works for construction works, 71320000-7 for engineering design services. 10. Under this contract, the Project Contractor undertakes to carry out copyright supervision. 11. All built-in devices and construction products should have appropriate approvals or certificates. 12. The Contractor is obliged to perform the order on the terms and conditions described in the Material provisions of the contract, constituting Annex 10 to the ToR. 13. The contracting authority recommends that an on-site inspection of the facility be carried out. The date of the vision should be agreed with the representative of the Investment and Repair Department, tel. 723 965 055. 14. The contracting authority does not allow variants to be submitted. 15. The Contracting Authority shall allow the performance of part of the contract to be entrusted to a Subcontractor. 16. The Contracting Authority requests that the Contractor indicate in its tender the parts of the contract which it will entrust to Subcontractors and the names of any Subcontractors, if they are already known, in accordance with Annex 8 to the ToR. 17. The Contractor declares that he has at his disposal persons who will participate in the performance of the contract, having rights in accordance with the Construction Law, fully allowing for the implementation of the subject of the contract, according to Annex 5 to the ToR, including: 1) Design authority in the construction industry; 2) Design powers in the architectural industry; 3) Design authority in the installation industry; 4) SEP group 1 D and E privileges; 5) the power to drive robots in the relevant industries. 18. Contracting authority pursuant to Article 95(1)(b) CTMR 1 The Act requires the Contractor to employ, on the basis of an employment contract, persons performing activities in the scope of performance of the contract, if the performance of these activities consists in performing work in the manner specified in Art. 1 of the Labour Code Act of 26 June 1974 (Journal Journal of Laws 2025, item 277, as amended), hereinafter referred to as the Labour Code. 19. The contracting authority requires employment on the basis of an employment relationship of at least four persons in accordance with Article 95 of the Act, who will perform the following activities during the performance of the contract, according to Annex 6 to the ToR: 1) construction works; 2) electrical and teletechnical works. 20. In the process of real
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BEREDA sp. z o.o. | 6 | 2022–2024 |
| JARPER SP. Z O.O. | 5 | 2021–2026 |
| Robs Sp. z o.o. | 5 | 2021–2026 |
| CYTRUS Gospodarstwo Ogrodniczo-Sadownicze Janusz Pawlak | 5 | 2021–2026 |
| TOMDAR Spółka Jawna Wioletta Szubierajska, Dariusz Staśkiewicz | 4 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.