Reconstruction of the pavement into a road for pedestrians and bicycles in Professor Kazimierz Michałowski Street in Częstochowa
Przebudowa chodnika na drogę dla pieszych i rowerów w ul. prof. Kazimierza Michałowskiego w Częstochowie
Poland · Częstochowa · how to bid here →
Your path to submission
- Deadline: 16 October at 10:30 — 12 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (115 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to RAFALIN Sp. z o.o., Spółka Komandytowa.n = 115
- The median procedure drew 2 bids (24 procedures with a bid count); 42% ended with a single bidder. Sector: median 5 bids.n = 24
- 56% of this buyer's awards went to companies that had already won here before (189 awards since 2021, spread over 74 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 189 awards since 2021
- 2% of awards went to companies from abroad (189 awards with a known winner country). Sector average: 0%.n = 189
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 1 (from 6 awards).
What the buyer is looking for
The conversion of the pavement into a road for pedestrians and bicycles at Prof. Kazimierza Michałowskiego Street in Częstochowa includes, inter alia: - demolition of colliding surfaces, curbs, etc.; - construction of a bituminous road for pedestrians and cyclists; - reconstruction of 4 bus bays with platforms and integration tiles; - reconstruction of the bus platform; - reconstruction of two intersections and exits; - execution of vertical and horizontal markings; - adjustment of wells, grooves and gates to the designed rows; - restoration and ordering of green areas. NOTE: The project documentation is amended as follows: • bus bay at ul. Schiller - the direction of Fieldorf-Niila make according to the design of the reconstruction of the pavement for the road for pedestrians and bicycles; • bus bay at ul. Schiller - the direction of the Liberation Avenue is carried out according to the…
Show full description
… project of reconstruction of bus bays; • the surface of all rebuilt bus bays is made of concrete with scattered reinforcement (fibroconcrete); • frames of bus bays made of stone curb; • pavement and platform surfaces are made of 35x35 cm concrete slabs.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Rafalin Sp. z o. o. Sp. komandytowa | 18 | 2022–2026 |
| DROG-BUD Sp. z o.o. | 12 | 2022–2026 |
| DROGEX s.c. W. Piątek, M. Piątek Al. Armii Krajowej 1/3 lok.103 42-202 | 10 | 2021–2025 |
| GALICKI SPÓŁKA KOMANDYTOWA | 9 | 2023–2026 |
| Inżynieria Ruchu Drogowego Sp. z o.o. | 8 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.