Friedrich & ClementBETA

Renovation of the historic park in Miłosław and construction of a rainwater sewerage system in Orzechów – improvement of infrastructure and environmental protection in Miłosław Commune

Rewaloryzacja zabytkowego parku w Miłosławiu oraz budowa kanalizacji deszczowej w Orzechowie – poprawa infrastruktury i ochrony środowiska w Gminie Miłosław

Poland · Miłosław · how to bid here →

Your path to submission

  1. Deadline: 16 October at 09:00 — 11 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (34 awards, most recently July 2026) — the next award is due around October 2026 by that rhythm. The last award went to BUD-OWY SP. Z O.O..n = 34
  • The median procedure drew 2 bids (12 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 12
  • 46% of this buyer's awards went to companies that had already won here before (86 awards since 2020, spread over 44 companies). 54% went to new names.n = 86 awards since 2020
  • 1% of awards went to companies from abroad (86 awards with a known winner country). Sector average: 0%.n = 86

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. PART I – Rehabilitation of the historic park in Miłosław The subject of the contract for Part I (implementation in the ‘design and build’ formula) is: − preparation of complete design documentation necessary to perform the subject of the contract, to the extent required by law, this TPD, OPZ, PFU, contract, issued administrative decisions and permits and agreements of the competent monument protection authority, together with obtaining the required arrangements, opinions, decisions, permits and other documents necessary to start and properly perform works, − preparation or updating of maps for design purposes to the extent necessary to develop design documentation and perform the subject of the contract, − preparation of as-built documentation to the extent required by law and necessary for the proper completion, acceptance and use of the subject of the contract, − provision of…

Show full description

… construction management and persons performing the functions of works managers to the extent required by law and procurement documentation, − conducting authorship supervision by designers with the required permissions, to the extent and for the period necessary for the proper implementation of the investment, − preparation of a safety and health protection plan (BIOZ), if the obligation to prepare it results from the provisions of law, - execution of pavements and pedestrian paths, including the reconstruction and replacement of existing park surfaces with a mineral surface with the parameters specified in the design documentation, PFU and OPZ, with the approval of equivalent solutions, as well as the construction of a granite cube surface and the construction of paths from the ground surface improved in wetlands, - demolition and construction of new stairs adapted to the needs of users - in two locations; - repair of bridges, − planting trees, shrubs and perennials and establishing flower meadows, - installation of hotels for insects, - replacement of existing benches with new ones with a style adapted to the character of the historic park and installation of rubbish bins harmonizing with benches, − installation of electrical devices and lighting, including spot lighting of the monument of Juliusz Słowacki and solar lighting along selected park paths; − revitalization (cleaning) , deepening and demurculation of the sections of watercourses and water reservoirs indicated in the OPZ, including the method of refutation, along with depositing sediment on the prepared refulification field and removing the indicated obstacles from the channel of the watercourse. The detailed material scope of Part I is specified in the Description of the Subject of the Contract (OPZ), which is attached to this Terms of Reference, together with the Functional-Use Programme (PFU), relevant administrative decisions, permits, arrangements and other procurement documents. In so far as the CMO and the annex to Convertible Decision No 240/2026 of 22 June 2026 define a different scope from that of the PFU, the scope specified in the CMO and in the abovementioned decision takes precedence. Annex to the Convertible Decision. In particular, this concerns the surface range of the main driveway in front of the palace and the number of new stairs, as detailed in the OPZ. 2. PART II - Construction of rainwater sewerage in Orzechów The subject of the contract in the scope of Part II is the construction of rainwater sewerage along with rainwater retention tank with an active capacity of 60m3 (the tank will consist of 6 tanks with an active capacity of 10m3 each, connected into one tank by PVC pipes) and accompanying infrastructure in Orzechów, for the purpose of managing rainwater from the roofs of the primary school building in Orzechów. A detailed description of this lot is provided in the design documentation annexed to this tender specification.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGMINA MIŁOSŁAW
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published1 October 2026
CategoryConstruction work · CPV 45112700-2

Who has won here before

CompanyAwardsPeriod
IGLESPOL Z. IGLEWSKI I WSPÓLNICY SPÓŁKA JAWNA102021–2026
FIRMA DROGOWA BEGIER SŁAWOMIR SPÓŁKA KOMANDYTOWO-AKCYJNA62024–2026
BUD-OWY SP. Z O.O.62023–2026
Wrocławskie Przedsiębiorstwo Oczyszczania ALBA S. A.62023–2025
ENEA Oświetlenie Sp. z o.o.52022–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20216
202210
202312
20249
20255
202612

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 16 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →