Budowa odwodnień terenu z podziałem na 3 części
Poland · Łódź · how to bid here →
Your path to submission
- Deadline: 16 October at 10:00 — 13 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (340 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Miejskie Przedsiębiorstwo Komunikacyjne – Łódź Sp. z o.o..n = 340
- The median procedure drew just one bid (20 procedures with a bid count); 50% ended with a single bidder. Sector: median 5 bids.n = 20
- 48% of this buyer's awards went to companies that had already won here before (1,115 awards since 2019, spread over 564 companies). 52% went to new names.n = 1,115 awards since 2019
- Not one of the 1,115 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 1,115
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject of the contract is the construction of the drainage of the existing area – a car park at ul. Julianowska in Łódź. A detailed description of the subject of the contract is included in the design documentation and Technical Specifications for the Execution and Acceptance of Construction Works. 2. The subject of the contract is the construction of drainage of the road lane ul. Swimming in the boat. A detailed description of the subject of the contract is included in the design documentation and Technical Specifications for the Execution and Acceptance of Construction Works. 3. The subject of the contract is the construction of drainage of the road lane ul. Swimming in the boat. A detailed description of the subject of the contract is included in the design documentation and Technical Specifications for the Execution and Acceptance of Construction Works
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MPO - Łódź Sp. z o.o. | 21 | 2021–2026 |
| G&P TEAM Sp. z o.o. | 16 | 2022–2026 |
| Usługi Komunalne "TICET" Jacek Czach | 13 | 2022–2026 |
| "ANDRO" Anna Fijałkowska | 11 | 2021–2025 |
| Larkbud Sp. z o.o. | 11 | 2022–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.