Reconstruction of Krasinski Street and Kazimierz the Great Street together with a raised intersection in Gorzow Wielkopolski
Przebudowa ul. Krasińskiego oraz ul. Kazimierza Wielkiego wraz z wyniesionym skrzyżowaniem w Gorzowie Wielkopolskim
Poland · Gorzów Wielkopolski · how to bid here →
Your path to submission
- Deadline: 16 October at 10:00 — 11 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (155 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Usługi Sprzętowo - Transportowe Karol Wiącek.n = 155
- The median procedure drew 2 bids (34 procedures with a bid count); 47% ended with a single bidder. Sector: median 5 bids.n = 34
- 43% of this buyer's awards went to companies that had already won here before (416 awards since 2015, spread over 211 companies). 57% went to new names.n = 416 awards since 2015
- 1% of awards went to companies from abroad (416 awards with a known winner country). Sector average: 0%.n = 416
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. Partial contract No 1 – Reconstruction of ul. Krasiński in Gorzów Wielkopolski’ The subject of the contract is the reconstruction of municipal road No 100744F: ul. Krasiński on a section with a total length of about 163 m in km 0+000 to 0+163.1 in Gorzów Wlkp. The section of the municipal road covered by the investment currently has a bituminous surface. The surface in question has cracks, cavities and refurbished bumps. Construction works related to the reconstruction will be carried out on the existing track of the roadway. The scope of work includes, inter alia: demolition of existing degraded layers and construction of new ones: abrasive with a thickness of 4 cm from the mix of AC11S and binding with a thickness of 5 cm with AC16W, on the existing substructure after reinforcement. Gear ratio and height adjustment of sidewalks. Detailed location: parcels with registration number:…
Show full description
… 196 and 271; rev. 5 – Śródmieście, Ewid. Gorzów Wlkp. The works will be carried out on the basis of the submitted notification of works to the architectural and construction administration. The scope of the works to be carried out and the technology of the works shall be determined in particular by: a) Design documentation, b) Technical Specifications for Execution and Acceptance of Works, c) Billing Elements Table, d) Draft Contract. Comments of the Contracting Authority: The documents describing the subject-matter of the contract should be regarded as complementary and explanatory. If discrepancies, ambiguities or ambiguities are found, the Contractor may not limit the scope of his obligation or his obligation to exercise due diligence in the performance of the contract. Where the documentation describing the subject-matter of the contract includes an indication of the names of the materials, equipment or technology, it shall be considered only as an indication of the technical, performance or quality standards required. The contracting authority allows the use of equivalent materials, equipment and solutions, provided that the technical and quality parameters are not inferior to those specified in the documentation. Where standards, European technical assessments, approvals, technical specifications or technical reference systems referred to in Article 101(1) are referred to in the documentation describing the subject-matter of the contract. 1 point 2 and par. 3 of the Public Procurement Law Act, the Contracting Authority accepts equivalent solutions. The duties of the works manager, who will participate in the implementation of the subject of the contract, will include: – organising and managing the construction in a manner consistent with the simplified design, bill of quantities, SST, requirements of the Contracting Authority and regulations, including technical-construction and occupational health and safety regulations, – taking over from the Contracting Authority on a protocol basis and securing the construction site appropriately, – informing the owners of the properties located in the vicinity of the works carried out about the difficulties occurring, – keeping construction documentation, – reporting to the Contracting Authority for verification or acceptance of works subject to covering and fading works, – supervising the quality and timeliness of the works carried out, – coordinating the work of own forces and subcontractors, – conducting analyses of the progress of works, – preparing as-built and acceptance documentation and preparing financial and material settlements. Guarantee period: The warranty period for the completed works is 48 months, counting from the date of signing the final acceptance protocol for the works. The order must be executed in accordance with this Instruction for Contractors, the provisions of the Draft Contract and the technical documentation forming an integral part of the Terms of Reference. 2. Sub-contract No 2 – Reconstruction of ul. Kazimierz Wielki and the elevated intersection in Gorzów Wielkopolski’ The subject of the contract is the reconstruction of ul. Casimir the Great with an elevated intersection in the plots with the number of ewid.: 317; 1878/2; 250/36; 320/2 rpm 01 - Chwalęcice and 1621 RPM 04 - Staszica, according to the design documentation. As part of the reconstruction of the road, the existing carriageway of the district road will be rebuilt within ul. Casimir the Great and roads for pie
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Usługi Sprzętowo - Transportowe K. Wiącek | 14 | 2021–2026 |
| Prywatne Przedsiębiorstwo Usługowo-Drogowe „DROGUS” Krzysztof Wiącek | 13 | 2021–2026 |
| F.P.H.U. CHEĆKO Jacek Chećko | 13 | 2022–2025 |
| Zakład Projektowania i Usług Komunalnych „PORAJ” | 10 | 2021–2025 |
| INNEKO RCS sp. z o.o. | 10 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.