Friedrich & ClementBETA

Performance of the Contract Engineer function in the implementation of the task: "Construction of a pedestrian and cyclist bridge over the Swędrnia River in Kalisz with access roads"

Pełnienie funkcji Inżyniera Kontraktu przy realizacji zadania pn.: „Budowa kładki dla pieszych i rowerzystów nad rzeką Swędrnią w Kaliszu wraz z dojściami / dojazdami”

Poland · Kalisz · how to bid here →

Your path to submission

  1. Deadline: 9 October at 12:00 — 3 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (18 awards, most recently April 2026) — by that rhythm the next award was due around August 2026. The last award went to Rafał Ślusarski Specjalistyczne Biuro Inwestycyjno - Inżynierskie "PROSTA PROJEKT".n = 18
  • 54% of this buyer's awards went to companies that had already won here before (113 awards since 2021, spread over 43 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 113 awards since 2021
  • The median procedure drew 2 bids (10 procedures with a bid count); 40% ended with a single bidder. Sector: median 4 bids.n = 10
  • 3% of awards went to companies from abroad (113 awards with a known winner country). Sector average: 1%.n = 113

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.

Typical field: median 4 (from 4,644 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is performing the function of Contract Engineer in the implementation of the task entitled: ‘Construction of footbridges for pedestrians and cyclists on the Sędrnia River in Kalisz with accesses/communications’. Due to the limited number of characters, the description of the subject of the contract can be found in point 4 of the ToR.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerMiasto Kalisz - Zarząd Dróg Miejskich w Kaliszu
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published30 September 2026
CategoryArchitecture & engineering · CPV 71247000-1

Who has won here before

CompanyAwardsPeriod
Przedsiębiorstwo Budownictwa Drogowego S.A. Kalisz252021–2026
Przedsiębiorstwo Budownictwa Drogowego S.A. w Kaliszu52024–2026
Przedsiębiorstwo Oczyszczania Miasta EKO Sp. z o.o.52022–2026
DROKAL Wojciech Grygielski42022–2025
EKO-NAJ Artur Różewicz42021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20225
20232
20243
20253
202618

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 9 October at 12:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Performance of the Contract Engineer function in the implementation of the task: "Construction of a pedestrian and cyclist bridge over the Swędrnia River in Kalisz with access roads"