Friedrich & ClementBETA

Delivery of concrete and laying of concrete on the maneuvering area CSLog in m. Grupa gm. Dragacz - case no. 104/2026

Dostawa betonu oraz rozłożenie betonu na placu manewrowym CSLog w m. Grupa gm. Dragacz - sprawa nr 104/2026

Poland · Grudziądz · how to bid here →

Your path to submission

  1. Deadline: 12 October at 09:30 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 6 months (24 awards, most recently March 2026) — by that rhythm the next award was due around September 2026. The last award went to Przedsiębiorstwo Produkcyjno Handlowe TEX - 2 Sp. z o.o. Sp. k..n = 24
  • 39% of this buyer's awards went to companies that had already won here before (599 awards since 2015, spread over 326 companies). 61% went to new names.n = 599 awards since 2015
  • The median procedure drew 2 bids (54 procedures with a bid count); 39% ended with a single bidder. Sector: median 3 bids.n = 54
  • 2% of awards went to companies from abroad (599 awards with a known winner country). Sector average: 1%.n = 599

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Construction materials, 26 contracts went to foreign companies over the last 3 years (of 9,154 recorded awards) — mostly from Germany, Czechia, France.

Typical field: median 3 (from 1,804 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the delivery of concrete and the laying of concrete on the CSLog manoeuvring square in the Dragacz Group. The scope of the contract consists in the supply of fresh concrete mix along with its transport to the area of the Ordering Party's military complex, unloading, unfolding, compacting, leveling and finishing the surface of the manoeuvring area and performing all the activities necessary for the proper performance, protection, care of the concrete surface, with the proviso that if it is necessary to care for concrete in the first stage of maturation, consisting in spraying the surface with water, these activities will be carried out by the Ordering Party. The scope of the subject of the contract includes: 1) Delivery of road concrete mixture C30/37 with the addition of polymer fibers with a length of 38-50 mm in the amount of 2kg/m3 and waterproof class…

Show full description

… min. W8. In total, 640,0 m3 of concrete should be delivered. 2) Laying on the finished ground a layer of concrete with a thickness of 23-24 cm by means of a concrete pump, with compaction by means of any equipment (vibrating patch, vibrating roller). Dehydration of the area will occur on the surface, on the adjacent green area. It is required to profile the square with a one-way drop of 1.5% over its entire length. 3) Laying of concrete should be carried out in rainless weather and ambient temperature above 5oC. If lower temperatures occur (4.9oC to -2oC), additives will be required to allow the laying of concrete under these conditions. In the event of local frosts (maximum -2oC), work should be stopped until the weather conditions improve, or the surface should be protected with mats. 4) Texturing of the surface by brushing to obtain a rough surface, allowing adhesion of the wheels in wet conditions. 5) Expansion fields by mechanical incision to a depth of 1/3 of the thickness of the concrete layer with a mesh of 6.0 x 6.0 m. the width of the gaps – 12 mm, the incisions should be made up to 24 hours after laying the concrete. 6) Filling expansion joints with bituminous flooding mass. Use a wide expansion cord to support the mass. 15 mm, which should be set at a distance of 3,0 cm from the bottom of the gap (dilatation void) 7) Care of concrete by protection in case of too low temperatures with protective mats and / or foil, depending on weather conditions 1) Due to the expected date of performance of the subject of the contract, the Contractor is obliged to take into account the possibility of low temperatures, frost, frost, rainfall and other weather conditions affecting the process of binding and maturing concrete. 2) The Contractor is responsible for the selection of concreting technology appropriate to the actual atmospheric conditions occurring during the implementation and expected during the maturing period of the concrete. 3) If the proper performance of the subject of the contract requires the use of technology of concreting at a reduced temperature, the Contractor is obliged to apply technological solutions ensuring the proper performance and maturation of concrete. 4) Technology, may include, in particular, the appropriate selection of components of the mixture, the appropriate temperature of the mixture at the time of laying, the use of appropriate admixtures / additives, appropriate surface protection and proper care. 5) The Ordering Party does not indicate a specific manufacturer or trade name of the admixture/additive. The choice of the admixture/additive, its type, dose and method of application is the responsibility of the Contractor, who is responsible for the correctness of the adopted technological solution. 6) The admixture/additive used must be intended for use in concrete mixtures in accordance with its properties, manufacturer's documentation and applicable regulations and standards. 7) The use of an admixture/additive does not release the Contractor from the obligation to perform other activities necessary for proper protection

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

Buyer13 WOJSKOWY ODDZIAŁ GOSPODARCZY
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published30 September 2026
CategoryConstruction materials · CPV 44114100-3

Who has won here before

CompanyAwardsPeriod
Firma "Lemar" s.c. M.W. Lewandowscy; Firma "Lemar" s.c. Lewandowska Wanda; Firma"Lemar" s.c. Lewandowski Marek w spadku102021–2026
Fire-Max Sp. z o.o.102021–2026
NORD-GLAS Marcin Nastały102022–2025
Zakład Remontowo-Budowlany REM-BUD BIS Marek Matczyński i Wspólnik Sp.j.102022–2026
METALZBYT-HURT SP. Z O.O.92021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20214
20222
20255
20265

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 09:30

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →
Delivery of concrete and laying of concrete on the maneuvering area CS — Friedrich & Clement