Friedrich & ClementBETA

Supply and installation of a photovoltaic installation on the community center building in Sławno

Dostawa i montaż instalacji fotowoltaicznej na budynku świetlicy w miejscowości Sławno

Poland · Wolanów · how to bid here →

Your path to submission

  1. Deadline: 6 October at 10:00 — 2 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 33% of this buyer's awards went to companies that had already won here before (87 awards since 2021, spread over 59 companies). 67% went to new names.n = 87 awards since 2021
  • Not one of the 87 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 87

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.

Typical field: median 3 (from 4,384 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Delivery and installation of a photovoltaic installation on a common room building in Sławno The subject of the contract are deliveries under the task entitled: Delivery and installation of a photovoltaic installation on the building of a common room in Sławno as part of the investment task entitled: ‘Construction of a photovoltaic installation and land development at the common room in Sławno’. Pursuant to Article 7(4) of the Public Procurement Act, a contract is a supply contract – it covers the purchase of products (photovoltaic modules, hybrid inverter, energy storage, assembly structure, accessories) together with their delivery, placement and installation (assembly) and commissioning. The subject of the investment is the construction of a photovoltaic installation with a capacity of 14.7kWp and an energy storage facility with a capacity of 10 kWh for the production of electricity…

Show full description

… from solar radiation aimed at its use for its own needs, i.e. a common room located in Sławno, plot No 123/4 of area 0022 Sławno.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGMINA WOLANÓW
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published29 September 2026
CategoryPetroleum & fuels · CPV 09332000-5

Who has won here before

CompanyAwardsPeriod
Przedsiębiorstwo Usługowo-Handlowe "ELDAR" Zbigniew Kiełek52022–2024
SMBI PROJEKT MICHAŁ SIUDA42023–2025
SPÓŁDZIELNIA SOCJALNA „POŻYTECZNI”42023–2026
Usługi Przewozowe Osób Janusz Walkiewicz; Biuro Podróży Jawal-Tour Janusz Walkiewicz32021–2024
PUH M-BUD Lucyna Marszałek32021–2022
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Tuesday 6 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Supply and installation of a photovoltaic installation on the communit — Friedrich & Clement