Development of a renovation concept for facilities - DW 897 Tylawa – Cisna – Wołosate: Task 1 bridge over the Osława river in Wola Michowa at km 50+088, Task 2 – bridge over the Osława river in Wola Michowa at km 51+325
Opracowanie koncepcji remontu obiektów - DW 897 Tylawa – Cisna – Wołosate: Zad.1 most przez rz. Osława w m. Wola Michowa w km 50+088, Zad.2 – most przez rz. Osława w m. Wola Michowa w km 51+325
Poland · Rzeszów · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (193 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to MOSTOLOGY Sebastian Smorąg.n = 193
- 58% of this buyer's awards went to companies that had already won here before (1,929 awards since 2015, spread over 630 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 1,929 awards since 2015
- The award came in at a median 51% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 7
- The median procedure drew 4 bids (348 procedures with a bid count); 26% ended with a single bidder. Sector: median 4 bids.n = 348
- 95% of the bids received came from small and medium-sized enterprises (23 procedures with a bid mix). Sector: 84%.n = 23
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 34 awards).
What the buyer is looking for
The subject of the contract is the development of a concept for the renovation of facilities along provincial road No 897 Tylawa – Cisna – Wołosate: Zad. No. 1 – bridge over rz. Osława w m. Wola Michowa w km 50+088; Zad. No. 2 – bridge over rz. Osława w m. Wola Michowa w km 51+325, containing a detailed scope of works together with technical solutions, drawing and costing documentation. The description of the subject-matter of the contract and the method of performance of the contract are set out in the OPZ, which is an annex to the tender specification.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Drogowo – Mostowe Spółka Akcyjna | 42 | 2021–2026 |
| MG Infrastruktura Marian Wołczyk | 40 | 2021–2026 |
| STRABAG Sp. z o.o. | 37 | 2021–2026 |
| BRU-dróg Mateusz Strenczak | 27 | 2021–2026 |
| PBI Infrastruktura S.A. | 26 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.