Construction of a pedestrian pathway connecting the SP12 sports complex with Nagórki-Jaroty Park in Olsztyn
Budowa ciągu pieszego łączącego kompleks sportowy SP12 z Parkiem Nagórki-Jaroty w Olsztynie
Poland · Olsztyn · how to bid here →
Your path to submission
- Deadline: 14 October at 09:00 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (78 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to GREEN-BUD Marcin Maciejewski.n = 78
- 26% of this buyer's awards went to companies that had already won here before (273 awards since 2015, spread over 145 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 273 awards since 2015
- The median procedure drew 2 bids (89 procedures with a bid count); 25% ended with a single bidder. Sector: median 5 bids.n = 89
- The award came in at a median 99% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 21
- 8% of awards went to companies from abroad (273 awards with a known winner country). Sector average: 0%.n = 273
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 4 (from 20 awards).
What the buyer is looking for
The subject of the contract is the construction of a walking path with a bicycle path in accordance with the architectural and construction project ‘SP12 i Park Nagórki Jaroty - Direct connection between the Park and the School: construction of a pedestrian route connecting the sports complex with the Park: on plots with cadastral numbers 106-138/2 and 106-51/19 in the municipality and cadastral unit of Olsztyn, Olsztyn district, Warmińsko-Mazurskie province.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Prywatne Przedsiębiorstwo SEWIL Sebastian Podlecki | 7 | 2022–2025 |
| GREEN-BUD Marcin Maciejewski | 5 | 2022–2026 |
| Sportsystem Sp. z o.o. | 5 | 2023–2026 |
| PIŁKA SIATKOWA AZS - UWM S.A. | 5 | 2021–2025 |
| HEMIBUD Emilia Wasilewska-Smółka | 4 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.