Purchase of a backhoe loader for the needs of carrying out tasks in the scope of civil protection and civil defence in the Municipality of Narol
Zakup koparko-ładowarki na potrzeby realizacji zadań z zakresu ochrony ludności i obrony cywilnej w Gminie Narol
Poland · Narol · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 3 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 23% of this buyer's awards went to companies that had already won here before (72 awards since 2018, spread over 47 companies). 77% went to new names.n = 72 awards since 2018
- The median procedure drew 2 bids (19 procedures with a bid count); 37% ended with a single bidder. Sector: median 3 bids.n = 19
- Not one of the 72 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 72
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Mining & construction machinery, 22 contracts went to foreign companies over the last 3 years (of 3,260 recorded awards) — mostly from Czechia, Belgium, Germany.
Typical field: median 3 (from 867 awards).
What the buyer is looking for
1. The subject of the public contract is the purchase and delivery of a backhoe loader. 1.1. A detailed description of the subject-matter of the contract, a description of the contracting authority's requirements for implementation and acceptance, shall specify: – description of the subject-matter of the contract – Annex 3 to the FTZ – draft provisions of the contract – Annex 2 to the FTZ. All the requirements set out in the documents indicated above are minimum requirements and their fulfilment is mandatory. Failure to meet the above-mentioned minimum requirements will result in the rejection of the tender as non-compliant with the terms of the contract on the basis of Art. 1 point 5 of the PPL Act.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PBI Infrastruktura S.A. | 4 | 2021–2026 |
| Danpol Jarosław Pękala Sp. z o.o. | 3 | 2022–2025 |
| Przedsiębiorstwo Robót Drogowo- Mostowych, Sp. z o.o. | 3 | 2022–2025 |
| BUDGAR Leżak Aneta | 3 | 2022–2025 |
| TAURON Sprzedaż sp. z o.o. | 2 | 2021–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.