Modernization of football field at Mechanical Schools Complex, Broniewskiego Street 14
Modernizacja boiska piłkarskiego przy Zespole Szkół Mechanicznych, ul. Broniewskiego 14
Poland · Białystok · how to bid here →
Your path to submission
- Deadline: 14 October at 11:00 — 11 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (269 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Przedsiębiorstwo Robót Elektrycznych i Budowlanych MIPA Leon Stankiewicz.n = 269
- The median procedure drew 3 bids (288 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 288
- 41% of this buyer's awards went to companies that had already won here before (1,156 awards since 2015, spread over 484 companies). 59% went to new names.n = 1,156 awards since 2015
- The award came in at a median 67% of the estimated value (27 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 27
- 5% of awards went to companies from abroad (1,156 awards with a known winner country). Sector average: 0%.n = 1,156
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 6 (from 11 awards).
What the buyer is looking for
1. The subject of the contract is the modernization of the football pitch at the Mechanical School Complex, ul. 14 of Broniewski. 2. The scope of the contract includes the execution of construction works in accordance with the building permit issued by the President of the City of Białystok of 25 June 2025, No 249/2025, ref.: DAR-III.6740.1.94.2025 (Annex 8 to the FTZ). 3. A detailed description of the subject of the contract is presented in the design documentation and technical specifications for the execution and acceptance of works developed by the Design and Advertising Services arch. Katarzyna Chyży, ul. Component of 7 lok. 121, 15 - 399 Białystok (Annex 7 to the SWZ). 4. The Contractor should submit any comments and objections to the documentation during the proceedings and apply to the Ordering Party for a decision. 5. The Ordering Party requires the provision of a minimum 5-year…
Show full description
… warranty for the works performed (the warranty period is subject to assessment in accordance with Chapter II of the Agreement). XIX SWZ). 6. The Contractor shall be responsible for the proper protection of the site of the works and shall be liable for any damage caused to the Ordering Party and third parties. 7. After completion of the works, the contractor is obliged to organize the site. 8. After all construction works have been carried out, on the investment site, in a place agreed with the Contracting Authority, the Contractor is obliged to install an information board (with a rack) on the financing of the project from the State Budget in accordance with the guidelines: a) Dimension of the board: 180 x 120 cm. b) Execution of the board: - A board made of composite board, plastic plexiglass or PVC with a thickness of at least 3 mm or placed on a metal backing with a double-rolled edge. - Colorless protective film resistant to water and UV rays. - Color graphics applied to the foil. - Non-reflective film with a shelf life of at least 5 years. - Application of the design, colours and fonts according to the Annex to the Regulation of the Council of Ministers of 7 July 2023 (item 1471) amending the Regulation on the definition of information activities undertaken by entities performing tasks financed or co-financed from the state budget or from state special-purpose funds in accordance with the model provided on the website: https://www.gov.pl/web/premiere/promotion. 9. COMMENTS: 1) Before starting the works, all works related to the protection of trees on the construction site (fences, deconstruction of the trunk, ligation of branches, etc.) should be carried out. 2) Construction works will be carried out in an active facility. 3) The Contractor must plan the execution of the most onerous and dangerous works in agreement with the management of the facility. 4) Construction works should be carried out with the provision of continuous access (access and access) to facilities adjacent to the above-mentioned investment during its implementation. 5) The producer and holder of waste in the form of scrap (steel/iron) generated during the implementation of the works is the City of Białystok, on whose behalf the City Office in Białystok acts. 6) The Contracting Authority may cancel the procurement procedure on the basis of Article 310 of the Public Procurement Act if the public funds that the Contracting Authority intended to allocate to finance all or part of the contract have not been granted to it.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Budownictwa Wodnego „HYDROS” Tadeusz Kulesza, Adam Kulesza Sp. J. | 27 | 2021–2026 |
| Biuro Obsługi Nieruchomości „GEOTAKSACJA” Piotr Gierasimiuk | 26 | 2021–2026 |
| BBGM Sp. z o.o. | 26 | 2022–2026 |
| Wycena Nieruchomości Joanna B. Waluk ̶Pacholska | 17 | 2021–2026 |
| WALMAR Waldemar Gajko | 17 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.