Friedrich & ClementBETA

Design and execution of construction works for the investment task: Increasing energy efficiency of the building of the Faculty of Art and Science of Education of the University of Silesia in Katowice

Zaprojektowanie i wykonanie robót budowlanych zadania inwestycyjnego pn. Zwiększenie efektywności energetycznej budynku Wydziału Sztuki i Nauki o Edukacji Uniwersytetu Śląskiego w Katowicach

Poland · Katowice · how to bid here →

Your path to submission

  1. Deadline: 13 October at 09:00 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (58 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to NDI S.A..n = 58
  • The median procedure drew 2 bids (361 procedures with a bid count); 35% ended with a single bidder. Sector: median 5 bids.n = 361
  • The award came in at a median 50% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 10
  • 38% of this buyer's awards went to companies that had already won here before (1,223 awards since 2015, spread over 630 companies). 62% went to new names.n = 1,223 awards since 2015
  • 64% of the bids received came from small and medium-sized enterprises (26 procedures with a bid mix). Sector: 84%.n = 26

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 11 (from 3 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1) The subject of the contract is the execution of construction works in the "design and build" formula at the Main Building of the Faculty of Arts and Educational Sciences in Cieszyn at ul. Bielska 62, together with obtaining in the name and on behalf of the Employer all administrative decisions necessary to start and carry out construction works as part of the planned investment. 2) The subject of the contract includes in particular: - preparation of design documentation together with obtaining on behalf of and for the Employer all administrative decisions and consents/arrangements necessary to start and implement construction works, - execution on the basis of the design documentation of construction works prepared and accepted by the Employer, - performing multi-branch author's supervision over the implementation of the investment, to the extent resulting from the developed design…

Show full description

… documentation. 3) A detailed description of the subject of the contract is included in the design documentation, which consists of a functional and utility program (hereinafter: ‘PFU) and its annexes, which must be considered together with the contract. 4) The subject of the contract should be performed in the scope of design and execution of construction works together with performing author's supervision – within 20 months from the date of conclusion of the contract, with the proviso that the design works together with obtaining a certificate of lack of grounds for objecting to the notification of construction works to the architectural and construction administration authority or obtaining a building permit should be performed within 6 months from the date of conclusion of the contract. 5) The required minimum warranty period is indicated in the FTZ.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerUniwersytet Śląski w Katowicach
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
AF SEKO Sp. z o.o.582015–2025
BIT-TECHNOLOGIES Piotr Tomczyk, Dariusz Biernat, Maciej Permus Sp. j372021–2025
Piotr Migda112022–2026
Zakład Systemów Komputerowych ZSK Sp. z o.o.102021–2025
PRO OFFICE SPÓŁKA Z O.O.102021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202116
202232
20237
202417
202521
202628

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Design and execution of construction works for the investment task: Increasing energy efficiency of the building of the Faculty of Art and Science of Education of the University of Silesia in Katowice