Friedrich & ClementBETA

Construction of a tourist and educational shelter in the Skrzyszów forestry, division 146 - procedure II

Budowa wiaty turystyczno- edukacyjnej w leśnictwie Skrzyszów oddz.146 - postępowanie II

Poland · Gromnik · how to bid here →

Your path to submission

  1. Deadline: 13 October at 08:00 — 10 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 49% of this buyer's awards went to companies that had already won here before (40 awards since 2015, spread over 21 companies). 51% went to new names.n = 40 awards since 2015
  • Not one of the 40 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 40

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Poland · Construction materials, 26 contracts went to foreign companies over the last 3 years (of 9,154 recorded awards) — mostly from Germany, Czechia, France.

Typical field: median 3 (from 1,804 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1) The subject of the contract is:Construction of a tourist and educational shelter in forestry Skrzyszów oddz.146 The tender submitted in the procedure must cover the entire scope of works provided for in the FTZ and project documentation. Location of the investment – construction of a canopy in forestry Skrzyszów s.r.o. 146 Małopolskie Voivodship, Tarnów County, in the municipality of Tarnów. 2) The contract covers the construction of a tourist and educational shelter. Solid compact carport, contained in the contour of a regular hexagon. The canopy is made in traditional, wooden technology. A canopy with a built-up area of 34.60 m2. A canopy with a height of 5,30 m. The axial spacing of the poles – 3,50 m, the diagonal between the poles – 7,00 m. The details of the contract are set out in the construction project and the technical specifications for the execution and acceptance of the…

Show full description

… works. 1) The contractor of the works is responsible for the quality of their execution and for their compliance with the design documentation. Measuring works for the purposes of the works and all related costs shall be borne by the Contractor and shall be included in the contract price. 2) The Contractor is fully responsible for meeting the quantitative and qualitative requirements from any source the materials will be sourced. The Contractor shall bear all costs related to the delivery of materials to the construction site. 3) The Contractor is obliged to use only such equipment that will not adversely affect the quality of the works performed. 4) Equipment tailored to the scope of works should meet health and safety requirements. 5) All works should be carried out in accordance with applicable standards, building art, health and safety regulations, fire regulations and environmental protection regulations and recommendations of the Ordering Party 6) The Contractor will carry out marking and securing work sites for the duration of the works at his own expense. 7) A detailed description of the subject-matter of the contract is included in Annex 4 to the FTZ – design documentation, technical specifications for the execution and acceptance of works, drafting of works. 8) Additional information regarding the performance of the contract: The contracting authority reserves that there may be tonnage restrictions – appropriate vehicle loads appearing on the roads for the projected investment. The above should be taken into account when preparing the offer. Difficulties in this respect will not be a basis for changing the price. The Contractor shall be responsible for obtaining the appropriate approval from the public road operator for the carriage of the materials and equipment needed for the performance of the contract. Transport of materials to the site of the works must be carried out by means of transport adapted to the tonnage determined on the access roads to the place where the works are carried out. Other requirements for the performance of the subject-matter of the contract: 1. The contractor will be obliged to secure the construction site in accordance with the applicable law. 4 | S t r o n a 2. All materials used to perform the contract must have a release for free circulation and have a declaration of conformity or a certificate of conformity with the Polish Standard or technical approval in the absence of Polish Standards transposing European harmonised standards. 3. During the implementation of the investment, the Contractor shall provide the Ordering Party with the opportunity to check the construction materials that will be used to perform the subject of the contract. 4. The Contractor is obliged to restore to the proper condition and order of the construction site, as well as (if used) roads, real estate, equipment, facilities that the Contractor violated when performing the subject of the contract. As part of the financial statement, the Contractor shall take into account: 1) in the case of using subcontractors, coordinating the works of subcontractors bearing full responsibility for them, 2) carrying out the works taking into account all conditions and orders resulting from mutual agreements and obligations, 3) ensuring the proper condition and order of the place where the works are carried out, and in particular access roads, which the Contractor will violate in order to perform the subject of the contract, 4) repairing any damage from

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerNADLEŚNICTWO GROMNIK
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 September 2026
CategoryConstruction materials · CPV 44112100-9

Who has won here before

CompanyAwardsPeriod
Zakład Transportowo-Usługowy Marek Padoł82022–2026
Firma Usługowo Handlowa Jan Marek Stanuch62022–2025
Firma Transportowo-Handlowa MET- TRANS Tadeusz Łazarek42021–2026
Zako Trade Sp. z o.o. sp.k.22022
TRANSDREW Jarosław Golonka22023
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20242
20262

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 08:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →