Preparation of project documentation for task: 08410 entitled "Walking path along Steblówka – Stabłowice from Kruszcowa Street to Piechowicka Street in Wrocław – project no. 92/WBO.2025"
Opracowanie dokumentacji projektowej dla zadania: 08410 pn. „Ścieżka spacerowa wzdłuż Steblówki – Stabłowice od ul. Kruszcowej do Piechowickiej we Wrocławiu – projekt nr 92/WBO.2025”
Poland · Wrocław · how to bid here →
Your path to submission
- Deadline: 7 October at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (57 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to KBH INWESTYCJE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA.n = 57
- 45% of this buyer's awards went to companies that had already won here before (155 awards since 2021, spread over 84 companies). 55% went to new names.n = 155 awards since 2021
- Not one of the 155 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 155
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
1. The subject of the contract is the preparation of design documentation together with obtaining complete and final administrative decisions required by law enabling the implementation of construction works and performing author's supervision for task No. 08410 entitled: ‘Still walk along Steblówka – Stabłowice from ul. Kruszcowa do Piechowicka in Wrocław – project No 92/WBO.2025’ 2. A detailed description of the subject of the contract can be found in Part III of the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Pro-Tra Building Sp. z o.o. | 11 | 2021–2026 |
| Elektrotim S.A. | 8 | 2021–2025 |
| ROTOMAT SP. Z O.O. | 8 | 2021–2026 |
| Dolnośląska Pracownia Projektowa Sp. z o.o. | 8 | 2024–2026 |
| PBW INŻYNIERIA Sp. z o. o. | 7 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.