Replacement of cold water, hot water and circulation water supply network along with necessary replacement of conflicting heating and hot water installations in the hospital basements – stage – building I
Wymiana sieci wodociągowej wody zimnej, ciepłej, cyrkulacji wraz z niezbędnymi wymianami kolidującej instalacji c.o. i c.t. w piwnicach szpitala – etap – budynek I
Poland · Bydgoszcz · how to bid here →
Your path to submission
- Deadline: 16 October at 10:00 — 10 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 9 months (14 awards, most recently July 2026) — the next award is due around April 2027 by that rhythm. The last award went to RAF-NET Sp. z o.o..n = 14
- The median procedure drew 3 bids (1,890 procedures with a bid count); 30% ended with a single bidder. Sector: median 5 bids.n = 1,890
- 40% of this buyer's awards went to companies that had already won here before (2,293 awards since 2015, spread over 1,200 companies). 60% went to new names.n = 2,293 awards since 2015
- 8% of awards went to companies from abroad (2,293 awards with a known winner country). Sector average: 0%.n = 2,293
- The award came in at a median 84% of the estimated value (42 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 42
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject-matter of the contract is works involving the replacement of the water supply network for cold, hot water, circulation and central heating in the basement level of the building ‘I’. The purpose of the renovation is to improve the conditions of use of the building. 2. A detailed description and method of execution of the order can be found in: 1) Annex No 5 to the FTZ – Model contract (Draft provisions of the contract), 2) Annex No 7 to the FTZ – description of the subject-matter of the contract (OPZ), 3) Annex No 8 to the FTZ – Measure 4) Annex No 9 to the FTZ – Technical Specification and Acceptance of Construction Works (STWiORB) 5) Annex No 10 to the FTZ – Technical design and inventory.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Skamex Spółka akcyjna | 24 | 2024–2026 |
| Zarys International Group Sp. z o.o. Sp.k. | 23 | 2024–2026 |
| Bialmed Sp. z o.o. | 20 | 2021–2026 |
| Urtica Sp. z o.o. | 19 | 2024–2026 |
| Becton Dickinson Polska Sp. z o.o. | 18 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.