Development of design documentation for kayaking infrastructure on the Radunia River
Opracowanie dokumentacji projektowej infrastruktury kajakowej na rzece Raduni
Poland · Juszkowo · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (19 awards, most recently June 2026) — the next award is due around November 2026 by that rhythm. The last award went to ROADI Sp. z o.o..n = 19
- The median procedure drew just one bid (22 procedures with a bid count); 55% ended with a single bidder. Sector: median 4 bids.n = 22
- 41% of this buyer's awards went to companies that had already won here before (233 awards since 2015, spread over 110 companies). 59% went to new names.n = 233 awards since 2015
- 1% of awards went to companies from abroad (233 awards with a known winner country). Sector average: 0%.n = 233
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
1. The subject of the contract is the development of a multi-branch concept, construction design, executive design, investor's estimate, bill of quantities and technical specifications for the execution and acceptance of works for the project consisting in the implementation of the following tasks: 1) Canoeing marina at the Recreation Centre in Juszków - Raduni River Trail, 2) Canoeing transfer at the Juszkowo hydroelectric power plant – Raduni River Trail, 3) Canoeing transfer at the Kuźnice hydroelectric power plant – Raduni River Trail, 4) Canoeing transfer at the Prędzieszyn hydroelectric power plant – Raduni River Trail, The detailed scope of the design study is specified in the description of the subject of the contract constituting Annex No 10 to the SWZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Usługowe ESAND Adam Piasecki | 11 | 2021–2026 |
| Firma Ogólnobudowlana ARAT, Krzysztof Makurat | 9 | 2021–2025 |
| WPRD GRAVEL Sp. z o.o | 7 | 2022–2026 |
| PPHU BE-KA Beata Pękala | 7 | 2022–2026 |
| HYDRO-MAG Sp. z o.o. | 7 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.