Preparation of complete technical and construction documentation, including executive project, for the task of adapting basement rooms in SP2 and SP3 for MDS
Opracowanie kompletnej dokumentacji techniczno-budowlanej, w tym projektu wykonawczego, dla zadania polegającego na adaptacji pomieszczeń piwnicznych w SP2 i SP3 na MDS
Poland · Trzcianka · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (5 awards, most recently June 2023) — by that rhythm the next award was due around October 2023. The last award went to Lege Artis Łukasz Wyka.n = 5
- The median procedure drew just one bid (23 procedures with a bid count); 74% ended with a single bidder. Sector: median 4 bids.n = 23
- 37% of this buyer's awards went to companies that had already won here before (191 awards since 2015, spread over 110 companies). 63% went to new names.n = 191 awards since 2015
- 1% of awards went to companies from abroad (191 awards with a known winner country). Sector average: 0%.n = 191
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
1. The subject of the contract is the execution of complete technical and construction documentation (Part I – for SP2) necessary for the implementation of the planned investment, in accordance with the applicable regulations, standards and requirements of the Ordering Party. The documentation should include all required studies, arrangements, opinions, permits and other documents necessary for the proper preparation and implementation of the investment. A detailed description of the subject of the contract is set out in Annex 9 to the FTZ. 2. The subject of the contract is the execution of complete technical and construction documentation (Part II – for SP3) necessary for the implementation of the planned investment, in accordance with the applicable regulations, standards and requirements of the Ordering Party. The documentation should include all required studies, arrangements,…
Show full description
… opinions, permits and other documents necessary for the proper preparation and implementation of the investment. A detailed description of the subject of the contract is set out in Annex 9 to the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Grupa Jaworski sp. z o.o. | 11 | 2021–2026 |
| Kombud sp. z o .o. | 9 | 2021–2026 |
| REM_BUD Henryk Grzymski | 7 | 2022–2024 |
| Viabud sp. z o.o. sp. k. | 5 | 2023–2026 |
| FHU Cezary Kuberski | 5 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.