Construction of pedestrian and bicycle paths with accompanying infrastructure in the area of Gorlice Municipality - Expansion of the provincial road in Zagórzany consisting of the construction of a pedestrian and bicycle path section.

Budowa ciągów pieszo-rowerowych wraz z infrastrukturą towarzyszącą na obszarze Gminy Gorlice - Rozbudowa drogi wojewódzkiej w Zagórzanach polegająca na budowie odcinka drogi dla pieszych i rowerów.

Poland · Gorlice · how to bid here →

Your path to submission

  1. Deadline: 13 October at 09:00 — 7 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (78 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Firma Handlowo Usługowa TRANSROL.n = 78
  • The median procedure drew just one bid (8 procedures with a bid count); 100% ended with a single bidder. Sector: median 5 bids.n = 8
  • 52% of this buyer's awards went to companies that had already won here before (147 awards since 2018, spread over 62 companies). 48% went to new names.n = 147 awards since 2018
  • 2% of awards went to companies from abroad (147 awards with a known winner country). Sector average: 0%.n = 147

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,957 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

1. The subject of the contract is the implementation of the task entitled: Expansion of the provincial road No. 979 in Zagórzany consisting in the construction of a section of the road for bicycles and reconstruction of the existing section of the road for pedestrians into a road for pedestrians and bicycles, in the design and construction mode. 2. The execution of the contract is understood as the execution of all necessary design works and the execution of construction works related to the execution of walking and cycling routes. 3. The scope of the contract includes: 1) the design phase necessary to obtain a decision on the permit for the implementation of a road investment, together with a set of arrangements and studies and technical-executive documentation, 2) the execution of the cost estimate for the works, the drafting and technical specifications for the execution and…

Show full description

… acceptance of the works, 3) obtaining a decision on the permit for the implementation of a road investment – the contractor is obliged to apply for a decision with immediate enforceability, 4) notification on behalf of the Contracting Authority of the commencement of construction works, 5) the executive phase, 6) preparation of as-built documentation including a map of the geodetic as-built inventory (the map should be accompanied by an official clause by the body of the Geodetic and Cartographic Service or contain a statement on obtaining a positive result of verification) and other documents resulting from applicable standards and regulations. 7) making an effective notification of the completion of construction works together with obtaining a decision on the occupancy permit 4. A detailed description of the subject-matter of the contract is set out in the Functional and Utility Programme and its annexes – Annex 6 to the FTZ.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Gorlice
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published25 September 2026
CategoryConstruction work · CPV 45000000-7

Who has won here before

CompanyAwardsPeriod
Przedsiębiorstwo Drogowo-Mostowe GODROM Sp. z o.o.282021–2026
Jerzy Osioł-Zawadowicz Gor-Bud72022–2025
F.T.H.U. BAXMAT Andrzej Dobek62021–2026
FHUP MAXIMUS 1 Wiesław Oleś62021–2025
Artur Niemiec Firma Handlowo-Usługowa "Auto-Pal"52022–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20218
202216
202313
202422
202514
202616

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 09:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →