PURCHASE OF ELECTRICITY FOR THE NEEDS OF MILÓWKA MUNICIPALITY
ZAKUP ENERGII ELEKTRYCZNEJ DLA POTRZEB GMINY MILÓWKA
Poland · Milówka · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 10 months (10 awards, most recently December 2025) — by that rhythm the next award was due around September 2026. The last award went to MIXPOL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 10
- 24% of this buyer's awards went to companies that had already won here before (96 awards since 2021, spread over 73 companies). 76% went to new names.n = 96 awards since 2021
- Not one of the 96 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 96
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.
Typical field: median 3 (from 4,384 awards).
What the buyer is looking for
1. The subject of the contract is the purchase of electricity for the needs of the Municipality of Milówka for 122 power consumption points (PPE), including 6 with photovoltaic installations. The total planned amount of energy purchased during the contract period, i.e. from 1 January 2027 to 31 December 2027, is: 498 MWh, including for individual tariff groups: a) O12 I zone - 108 MWh b) O12 II zone - 202 MWh c) C12 and I zone - 34 MWh d) C12 and II zone - 65 MWh e) G12w I zone - 1 MWh f) G12w II zone - 1 MWh g) B23 I zone - 29 MWh h) B23 II zone - 12 MWh i) B23 III zone - 44 MWh j) G11 I zone - 1 MWh k) C11 I zone - 1 MWh The list of energy consumption points is shown in Annex 8 to the SWZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Usługi Remontowo-Budowlane i Ślusarsko-Spawalnicze Stanisław Oczkowski | 5 | 2021–2022 |
| Firma Michalina Kowalczyk | 4 | 2024–2025 |
| AGRO-GREŃ JAKUB GREŃ | 3 | 2022–2025 |
| Usługi Leśne Piotr Gołuch | 3 | 2022–2025 |
| NOBA EXIM Bartłomiej Norkowski | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.