Construction of warehouse halls in Tarnowskie Góry, at Pyskowiecka Street 54
Budowa hal magazynowych w Tarnowskich Górach, przy ul. Pyskowickiej 54
Poland · Tarnowskie Góry · how to bid here →
Your path to submission
- Deadline: 12 October at 10:00 — 6 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (35 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Safepass Sp. z o.o..n = 35
- 19% of this buyer's awards went to companies that had already won here before (114 awards since 2015, spread over 91 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 114 awards since 2015
- The median procedure drew just one bid (9 procedures with a bid count); 78% ended with a single bidder. Sector: median 5 bids.n = 9
- 1% of awards went to companies from abroad (114 awards with a known winner country). Sector average: 0%.n = 114
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
1. The subject of the contract is the construction of warehouse halls in Tarnowskie Góry, at ul. Pyskowicka 54. 2. The contract is co-financed by the Civil Protection and Civil Defence Programme for 2025/2026. 3. The scope of the contract includes: 1) construction of warehouse halls in Tarnowskie Góry, at ul. Pyskowicka 54 2) obtaining in the name and on behalf of the Ordering Party a valid decision on the use permit. 4. The detailed scope of the subject of the contract, a description of the Ordering Party's requirements for implementation and acceptance are specified in the following documents: a. design documentation (Annex No 5a-b to the FTZ), b. work preparation (Annex No 6 to the FTZ), c. STWiOR (Annex No 7 to the FTZ), d. Decision No 822/26 of 25 September 2026 – building permit (Annex No 8 to the FTZ); e. Draft provisions of the Agreement (Annex 4 to the FTZ). 5. Conditions for…
Show full description
… the performance of the contract. The subject-matter of the contract is to be carried out on the basis of tender documentation, design documentation and the drafting of works. If the Contractor finds that the above-mentioned documentation contains errors or deficiencies, he should immediately notify the Ordering Party of this fact. 6. The required warranty period for the subject of the contract is a minimum of 3 years (in words: three years), counting from the date of signing by the Employer, the Investor's Supervision Inspector (if established) and the Contractor of the faultless final acceptance protocol for works, with the exception of guarantees for equipment for which manufacturers' factory guarantees apply, which should be at least 2 years. Guarantees for devices granted by the manufacturer will be counted from the date signed by the Ordering Party, the Investor's Supervision Inspector (if it is established and the Contractor of the faultless final acceptance protocol of the works. 7. The Contracting Authority requires the Contractor or subcontractor to be employed on the basis of an employment contract within the meaning of the Labour Code of 26 June 1974 for the performance of the contract of persons performing activities falling within the so-called direct costs. Thus, this requirement applies to persons who perform activities directly related to the performance of works, i.e. so-called manual workers. The requirement does not apply, inter alia, to persons: construction managers, robots, geodetic service providers, suppliers of building materials. 8. Where a trade mark (brand), manufacturer, supplier, patent, origin, source or specific process which characterises the products or services provided by a specific Contractor or where standards, European technical assessments, common technical specifications or other references referred to in Article 101(1)(2) or Article 101(1)(2) have been indicated in the construction and execution design, technical specifications for the execution and acceptance of works, the bill of quantities of works shall be included in the bill of quantities. 3 of the Act, the Employer in accordance with Art. 5 of the Act allows the submission of an equivalent offer or in accordance with Art. 4 of the Act, offering solutions ‘equivalent’ to those indicated in the documentation, provided that they ensure that the technical parameters are not inferior to those assumed in the documentation and that they are consistent in terms of: 1) dimensions and construction (size, type, physical properties, number of components), 2) functional nature (function identity), 3) material characteristics (type and quality of materials), 4) technical parameters (strength, durability, technical data, hydraulic data, linear characteristics, design), 5) safety parameters of use, 6) emission standards. 9. The Contractor, at each request of the Ordering Party, is obliged to present in relation to the indicated materials safety marks, a declaration of conformity or technical approval or a certificate of conformity with the Polish Standard transposing European standards or an equivalent standard or a standard of the Member States of the European Economic Area transposing this standard or an equivalent or Polish Standard or equivalent in the absence of the Polish Standard transposing the standard
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Web-Profit Maciej Kuźlik | 6 | 2021–2025 |
| MERAZET Spółka Akcyjna | 3 | 2022–2026 |
| SUNTAR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 3 | 2026 |
| Expance Sławomir Czapiewski | 3 | 2022–2023 |
| Przedsiębiorstwo Budowlane FRAKTAL Sp. z o.o. | 3 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.