U/25/2026 Conducting training for employees of the University of Opole under the project "Competent Staff – Strengthening the Administrative Potential of the University of Opole"
U/25/2026 Przeprowadzenie szkoleń dla pracowników Uniwersytetu Opolskiego w ramach projektu „Kompetentna kadra – wzmocnienie potencjału administracyjnego Uniwersytetu Opolskiego”
Poland · Opole · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (50 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to Uniwersytet Łódzki.n = 50
- 40% of this buyer's awards went to companies that had already won here before (1,063 awards since 2015, spread over 500 companies). 60% went to new names.n = 1,063 awards since 2015
- The median procedure drew 2 bids (207 procedures with a bid count); 36% ended with a single bidder. Sector: median 2 bids.n = 207
- 8% of the bids received came from other countries (117 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 117
- 6% of awards went to companies from abroad (1,063 awards with a known winner country). Sector average: 2%.n = 1,063
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Education & training, 310 contracts went to foreign companies over the last 3 years (of 20,400 recorded awards) — mostly from Germany, Bulgaria, Spain.
Typical field: median 2 (from 1,460 awards).
What the buyer is looking for
1. 1. Part 1 - Training on "Excel - Basic, Intermediate, Advanced". 2. The description of the subject-matter of the contract for Lot 1 is set out in Annex 1A to the FTZ. 3. The Employer does not require employment by the Contractor or Subcontractor on the basis of the employment relationship of persons performing activities related to the performance of the contract, because the performance of the subject of the contract does not consist in performing work in the manner specified in Article 22. § 1 of the Labour Code. 4. The Ordering Party allows the Subcontractor to participate in the performance of the subject of the contract. In the event that the Contractor intends to perform the subject of the contract with the participation of Subcontractors, the Contracting Authority shall request the Contractor to indicate the part of the contract which it intends to entrust to subcontractors and…
Show full description
… the companies of these Subcontractors, if known (in the content of the tender – Tender Form – Annex 1 to the FTZ). In the event that the Contractor does not indicate in the tender the part that he intends to entrust to Subcontractors, the Contracting Authority will assume that the Contractor will carry out the order himself. Entrusting part of the contract to subcontractors does not release the Contractor from responsibility for the proper performance of the contract. 5. The subject of the contract will be performed within a maximum period of nine [9] months from the date of conclusion of the contract for Lot No 1. 6. The detailed training schedule will be agreed and communicated in agreement between the Contracting Authority (training coordinator) and the Contractor within 14 calendar days from the date of conclusion of the contract. 2. 1. Part 2 – Training on ‘Chatbots and AI in student support and administrative processes’. 2. The description of the subject-matter of the contract for Lot No 2 is set out in Annex 1B to the FTZ. 3. The Employer does not require employment by the Contractor or Subcontractor on the basis of the employment relationship of persons performing activities related to the performance of the contract, because the performance of the subject of the contract does not consist in performing work in the manner specified in Article 22. § 1 of the Labour Code. 4. The Ordering Party allows the Subcontractor to participate in the performance of the subject of the contract. In the event that the Contractor intends to perform the subject of the contract with the participation of Subcontractors, the Contracting Authority shall request the Contractor to indicate the part of the contract which it intends to entrust to subcontractors and the companies of these Subcontractors, if known (in the content of the tender – Tender Form – Annex 1 to the FTZ). In the event that the Contractor does not indicate in the tender the part that he intends to entrust to Subcontractors, the Contracting Authority will assume that the Contractor will carry out the order himself. Entrusting part of the contract to subcontractors does not release the Contractor from responsibility for the proper performance of the contract. 5. The subject of the contract will be performed within a maximum period of three [3] months from the date of conclusion of the contract for Lot No 2. 6. The detailed training schedule will be agreed and communicated in agreement between the Contracting Authority (training coordinator) and the Contractor within 14 calendar days from the date of conclusion of the contract. 3. 1. Part 3 – Training on “Communication in a team and how to create a zero waste office”. 2. The description of the subject-matter of the contract for Lot No 3 is set out in Annex 1C to the FTZ. 3. The Employer does not require employment by the Contractor or Subcontractor on the basis of the employment relationship of persons performing activities related to the performance of the contract, because the performance of the subject of the contract does not consist in performing work in the manner specified in Article 22. § 1 of the Labour Code. 4. The Ordering Party allows the Subcontractor to participate in the performance of the subject of the contract. In the event that the Contractor intends to perform the subject of the contract with the participation of Subcontractors, the Contracting Authority shall request the Contractor to indicate the part of the contract which it intends to entrust to subcontractors and the companies of these Subcontractors, if known (in the content of the tender – Tender Form – Annex 1 to the FTZ). In the event that the Contractor does not indicate in the tender the part that he intends to entrust to Subcontractors, Zamawi
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SIGMA Sp. z o.o. | 27 | 2021–2026 |
| ATABAJT Roik, Słowik, Mazurkiewicz S.J. | 27 | 2020–2026 |
| Przedsiębiorstwo Budowlane „Profbud” Wojtas Spółka Jawna | 20 | 2021–2026 |
| ABE Holding Sp. z o.o. | 15 | 2022–2026 |
| ARKANET Wojciech Oleś, Stanisław Zygor sp.j. | 14 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.