Construction of St. Barbara Street in Starachowice – part 1. Construction of Western Street in Starachowice – part 2
Budowa ul. Św. Barbary w Starachowicach – część 1. Budowa ulicy Zachodniej w Starachowicach – część 2
Poland · Starachowice · how to bid here →
Your path to submission
- Deadline: 14 October at 11:00 — 10 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (95 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ADOMIT Paweł Podeszwa.n = 95
- 28% of this buyer's awards went to companies that had already won here before (285 awards since 2015, spread over 158 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 285 awards since 2015
- The median procedure drew 3 bids (76 procedures with a bid count); 25% ended with a single bidder. Sector: median 5 bids.n = 76
- The award came in at a median 86% of the estimated value (25 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 25
- 6% of awards went to companies from abroad (285 awards with a known winner country). Sector average: 0%.n = 285
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 8 (from 6 awards).
What the buyer is looking for
1. The subject of the contract is the construction of ul. Saint Francis of Assisi Barbara in Starachowice. The detailed description of the subject-matter of the contract shall be specified in the design documentation, the technical specifications for the execution and acceptance of the works and the specifications for the works. The facility created as a result of the execution of this order is intended for all users, in particular, it will facilitate the movement of people with physical disabilities. An on-site visit by the , Contractor is not required, but is foreseen, prior to the submission of the tender. As the contract covers works in public areas, the Contractor may carry out the on-site inspection himself. The Contracting Authority requires the employment by the Contractor or subcontractor on the basis of an employment relationship, within the meaning of Article 22(1) of the…
Show full description
… Labour Code of 26 June 1974, of persons performing the indicated activities related to the performance of all parts of the contract, i.e.: For Part 1: - road works, - sanitary works, - electrical works, - works related to the construction of a technological channel. 2. The subject of the contract is the construction of West Street in Starachowice. The detailed description of the subject-matter of the contract shall be specified in the design documentation, the technical specifications for the execution and acceptance of the works and the specifications for the works. The facility created as a result of the execution of this order is intended for all users, in particular, it will facilitate the movement of people with physical disabilities. An on-site visit by the , Contractor is not required, but is foreseen, prior to the submission of the tender. As the contract covers works in public areas, the Contractor may carry out the on-site inspection himself. The Contracting Authority requires the employment by the Contractor or subcontractor on the basis of an employment relationship, within the meaning of Article 22(1) of the Labour Code of 26 June 1974, of persons performing the indicated activities related to the performance of all parts of the contract, i.e.: For Part 2: - road works, - sanitary works, - electrical works.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Spółdzielnia Socjalna „Starachowiczanka” | 9 | 2022–2026 |
| DROGMAR S.C. M. Godzina, P.Podeszwa, R. Godzina, M. Podeszwa | 8 | 2024–2026 |
| Spółdzielnia Socjalna STARACHOWICZANKA | 6 | 2018–2026 |
| Budromost-Starachowice Sp. z o.o. | 5 | 2024–2026 |
| SELBUD Sebastian Skuza | 5 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.