Friedrich & ClementBETA

Modernization of the irrigation system at the Forest Nursery in Nowy Młyn

Modernizacja systemu nawadniania Szkółki Leśnej w Nowym Młynie

Poland · Rzepin · how to bid here →

Your path to submission

  1. Deadline: 16 October at 10:00 — 12 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 13 months (11 awards, most recently June 2026) — the next award is due around July 2027 by that rhythm. The last award went to Firma Budowlana Kinga Nowacżewska.n = 11
  • 29% of this buyer's awards went to companies that had already won here before (25 awards since 2021, spread over 18 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 25 awards since 2021
  • Not one of the 25 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 25

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the execution of construction works consisting in the modernisation of the irrigation system of the Forest Nursery in Nowy Młyn. According to the existing state, water for irrigation of crops is drawn directly from the water intake located on the Ilanka River, 1052 m away from the Forest Nursery. Directly by the river there is a pumping unit, which includes a pumping station building and a draw-off chamber. The comprehensive modernisation of the irrigation system includes the following elements: - Modernisation of pumping station equipment P1 - The designed water fittings will be used to transfer water to the storage tanks planned to be installed in the nursery. - Modernisation of the electrical supply system - The existing electrical installation at the Nursery in Nowy Młyn was constructed in 1996 and served mainly to supply the container facility, which…

Show full description

… at that time had a social and office function. As a result of the construction of a social and technical building in 2002 and the emergence over the years of a number of other electrically powered devices, the cross-section of the existing power line is insufficient. It is not adapted to the high loads that the P2 pump unit will generate. - Construction of pumping station building P2 - Within the water reservoirs, the building in which the water fittings will be placed should be located. Due to its purpose, the building is designed in a traditional brick construction. - Installation of steel water storage tanks with a capacity of 2 x 338 m3. - Tanks are planned to be made as open, with a metal structure, placed on a foundation slab. This will allow the temperature of the rainwater to rise. The reservoir will act as a buffer – a supply of rainwater, supplied from the existing water intake located on the Ilanka river or, in the case of a low river status, from an alternative intake. - Execution of an alternative groundwater abstraction on the basis of an existing well - Due to the persistently low water level in the Ilanka river in recent years, which causes difficulties in raining crops, a solution for emergency replenishment of water reserves in tanks using the existing well is being designed. The water drawn from the underground intake will also supply the social and technical building with the following number: 109/674. - Modernisation of rain systems - During the design work, the existing rain system was assessed. The course of the sprinkler lines will not change, but the replacement of sprinklers adapted to current standards and irrigation surfaces is planned. Detailed Description of the subject of the Order is the design documentation, which includes: 1) land development project – constituting Annex 1A to the FTZ; 2) architectural and construction project – constituting Annex 1B to the FTZ. 3) technical design - executive design - constituting Annex 1C to the FTZ. 4) Technical Specifications for the Execution and Acceptance of Works – constituting Annex 1D to the FTZ. 5) Measurements of works – constituting Annex 1E to the FTZ. The contracting authority informs that the work dimensions attached to the FTZ do not determine the scope of the contract. The contractor itself should verify and determine whether it is necessary to carry out works other than those specified in the work orders and whether the quantities given are correct. The contractor is obliged to include in the price all costs for works necessary for the proper performance of the contract, in accordance with the technology of works specified in the FTZ and in the documents accompanying the FTZ describing the subject of the contract. Pre-measures are informative and auxiliary in calculating the price of the offer. 6) Ground tests – geotechnical opinion – attached as Annex 1F to the FTZ. 7) Formal documents constituting Annex 1G to the FTZ

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerNadleśnictwo Rzepin
TypeWorks
Estimated value1.398.043 PLN
Published25 September 2026
CategoryConstruction work · CPV 45232120-9

Who has won here before

CompanyAwardsPeriod
Gosposia Edyta Brzózka32021–2023
IDT Era Dronów Sp. z o. o32024–2026
Usługi Ziemne i Transportowe Artur Bober32021–2024
SOTER OCHRONA SP. Z O.O.32024–2026
Soter Ochrona Sp. z o. o.22022
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20211
20226
20231
20242
20251
20264

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 16 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →