Reconstruction of county road no. 1175F Sucha in Zielona Góra along with sidewalk construction
Przebudowa drogi powiatowej nr 1175F Sucha w Zielonej Górze wraz z budową chodnika
Poland · Zielona Góra · how to bid here →
Your path to submission
- Deadline: 14 October at 09:00 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (192 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to M&J Sp. z o.o..n = 192
- The median procedure drew 2 bids (84 procedures with a bid count); 36% ended with a single bidder. Sector: median 5 bids.n = 84
- 42% of this buyer's awards went to companies that had already won here before (419 awards since 2018, spread over 218 companies). 58% went to new names.n = 419 awards since 2018
- The award came in at a median 86% of the estimated value (42 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 42
- Across 6 procedures with structured selection criteria, this buyer most often required: Technical staff for execution (4 of 6), References: services (2 of 6), References: supplies (2 of 6), References: works (2 of 6).n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 3 (from 23 awards).
What the buyer is looking for
1. Name given to the order by the Ordering Party: ‘Reconstruction of district road No 1175F Sucha in Zielona Góra with the construction of a pavement’. 2. The subject of the contract includes the reconstruction of district road No 1175F Sucha in Zielona Góra together with the construction of a pavement – reconstruction of a roadway on a section of approx. 1 250 m and construction of a pavement with a length of approx. 643 m with road lighting, stop platforms, pedestrian crossing and reconstruction of conflicting power grids, within the historic avenue of trees entered in the register of monuments under number L-826/A. 3. A detailed description of the subject-matter of the contract is contained in Annex I.4 to the FTZ and in the documents referred to in point 3.4. SWZ. 4. The subject of the contract must be performed in accordance with the design documentation and the Technical…
Show full description
… Specifications for the Execution and Acceptance of Construction Works contained in Annex I.6 to the FTZ. 5. The Contracting Authority informs that for the scope specified in point 3.2. The FTZ was adopted as a cost estimate (indicative) on the basis of the quotation estimate contained in Annex I.7 to the FTZ. 6. The contractor will provide a guarantee for the works covered by the contract for a period of at least 48 months from the day following the date of receipt and warranty for a period of 6 months exceeding the warranty period. Note: The additional guarantee for the works (guarantee extension period) shall be scored in accordance with the tender evaluation criteria set out in point 30.2. SWZ. 7. The Contracting Authority informs that the indications of common names, trademarks, names of producers, photographs in the elements of the description of the subject of the contract, which may appear in the FTZ together with the annexes, serve only to determine visual, technical and quality characteristics. Product names, trademarks, patents or origin used in the FTZ together with the attachments should be treated as examples - the Ordering Party allows the use of equivalent products (materials, equipment). An equivalent product is a product that will have the same functional, visual, material and technical characteristics as a specific product indicated in the FTZ but is marked with a different trademark, patent or origin. The quality of the equivalent product must not be inferior to that described in the subject of the order, must not lower the standard in any way and must not change the rules and technical solutions adopted in this FTZ, and thus deprive the User of any performance, functionality, usability described or resulting from the FTZ. The contractor who accepts equivalent solutions (products) for the evaluation of the tender is obliged to prove the equivalence of the adopted solutions, including equipment and materials. In order to confirm that the offered equivalent solution meets the requirements set out in the FTZ, the Contractor is obliged to submit with the tender a detailed description / list of the offered subject of the equivalent contract, in which for each solution he will specify features allowing unambiguous identification of the solution offered and confirmation of compliance with the description of the subject of the contract. Note: Failure to submit such a description/list will be tantamount to adopting the solutions indicated in the FTZ and the annexes to the FTZ. 8. The Contracting Authority informs that if reference is made in the description of the subject-matter of the contract included in the FTZ together with the annexes to the standards, technical assessments, technical specifications and technical reference systems, solutions equivalent to those described, which are understood as such technical, operational and operational solutions that ensure compliance with the minimum requirements at a level not worse than that specified in the aforementioned documents, respectively, allowing to obtain the effect assumed by the Contracting Authority by means of the technical solutions indicated in the FTZ together with the annexes, are allowed. If reference is made in the FTZ together with annexes to specific standards or other regulations to be met by materials, equipment, devices and other goods as well as performed and tested works, the provisions of the latest edition or revised edition shall apply.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Drogowe BUD-DRÓG | 17 | 2021–2026 |
| PROGAMP Paweł Ratuś | 16 | 2021–2025 |
| Zakład Remontowo-Budowlany Maciej Jakuboszczak | 12 | 2022–2026 |
| Przedsiębiorstwo Remontowo-Drogowe „CAPRI-bit“ Eugeniusz Weiss | 9 | 2021–2026 |
| Taurus Budownictwo i Usługi Jarosław Kopciuch | 8 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.