Supply of municipal tractors for the needs of: SOKS Płomień Kostrze - part 1, KS Wanda - part 2, KS Wieczysta - part 3.
Dostawa traktorków komunalnych na potrzeby: SOKS Płomień Kostrze - część 1, KS Wanda - część 2, KS Wieczysta - część 3.
Poland · Kraków · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 51% of this buyer's awards went to companies that had already won here before (344 awards since 2021, spread over 164 companies). That is well above the sector norm (14%) — newcomers have a harder time here than elsewhere.n = 344 awards since 2021
- Not one of the 344 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 344
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Agricultural machinery, 9 contracts went to foreign companies over the last 3 years (of 2,671 recorded awards).
Typical field: median 2 (from 364 awards).
What the buyer is looking for
1. 1. The subject of the contract is: Supply of municipal tractors for SOKS Płomień Kostrze - part 1. 2. A detailed description of the subject-matter of the contract is attached as Annex 4.1 to the FTZ (material scope 4.1). 3. The Contractor is obliged to provide a minimum of 36 months guarantee for the delivered subject of the contract. The guarantee period for the subject-matter of the contract (to be assessed in criterion 2) must be indicated in the tender form, it must be given in months, and the extension of the guarantee period must relate to 12-month periods (e.g. 48 months, 60 months - no longer than 60 months). 4. The Contractor is obliged to execute the order on the terms and conditions described in the Draft provisions of the contract constituting Annex No. 2.1 to the FTZ. 2. 1. The subject of the contract is: Delivery of municipal tractors for KS Wanda - part 2. 2. A detailed…
Show full description
… description of the subject-matter of the contract is provided in Annex 4.2 to the FTZ (material scope 4.2 ). 3. The Contractor is obliged to provide a minimum of 36 months guarantee for the delivered subject of the contract. The guarantee period for the subject-matter of the contract (to be assessed in criterion 2) must be indicated in the tender form, it must be given in months, and the extension of the guarantee period must relate to 12-month periods (e.g. 48 months, 60 months - no longer than 60 months). 4. The Contractor is obliged to execute the order on the terms and conditions described in the Draft provisions of the contract constituting Annex 2.2 to the FTZ. 3. 1. The subject of the contract is: Supply of municipal tractors for: KS Perpetual Part 3. 2. A detailed description of the subject-matter of the contract is provided in Annex 4.3 to the FTZ (material scope 4.3). 3. The Contractor is obliged to provide a minimum of 36 months guarantee for the delivered subject of the contract. The guarantee period for the subject-matter of the contract (to be assessed in criterion 2) must be indicated in the tender form, it must be given in months, and the extension of the guarantee period must relate to 12-month periods (e.g. 48 months, 60 months - no longer than 60 months). 4. The Contractor is obliged to execute the order on the terms and conditions described in the Draft provisions of the contract constituting Annex 2.3 to the FTZ.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| EVERSPORT Sp. z o.o. | 16 | 2021–2025 |
| Przesiębiorstwo Robót Instalacyjnych i Budowlanych Halux Sp. z o.o. | 12 | 2021–2026 |
| Zakład Remontowo Budowlany | 9 | 2021–2025 |
| TOI TOI Polska Sp. z o. o. | 9 | 2022–2026 |
| Zabezpieczenie Ruchu Drogowego Sp. z o.o. | 7 | 2022–2026 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.