Friedrich & ClementBETA

Winter mechanical maintenance of municipal roads including streets in the city of Gostyń

Zimowe mechaniczne utrzymanie dróg gminnych w tym ulic na terenie miasta Gostyń

Poland · Gostyń · how to bid here →

Your path to submission

  1. Deadline: 5 October at 11:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 10 months (11 awards, most recently November 2025) — by that rhythm the next award was due around September 2026. The last award went to PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE "TRANS-KOM" Barbara Rajewska.n = 11
  • 54% of this buyer's awards went to companies that had already won here before (171 awards since 2015, spread over 72 companies). 46% went to new names.n = 171 awards since 2015
  • The median procedure drew 3 bids (49 procedures with a bid count); 14% ended with a single bidder. Sector: median 3 bids.n = 49
  • Not one of the 171 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 171

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Cleaning, environment & waste, 40 contracts went to foreign companies over the last 3 years (of 56,736 recorded awards) — mostly from Bulgaria, France, Czechia.

Typical field: median 3 (from 16,509 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the service of winter mechanical maintenance of municipal roads, including streets in the city of Gostyń. The contracting authority will commission the performance of the service in question within the framework of its financial resources, planned in the draft financial plan for 2026/2027. Note: The Ordering Party reserves the right to signal by telephone other dangerous places not covered by the basic order. The scope of services also includes: 1) Keeping records of the work of the equipment by the Contractor and daily reporting to the Ordering Party about the work performed. This report should be sent to the Ordering Party electronically or in a paper version each time after the actions taken by hours. 12:00 a.m. – daily (from 1 p.m. 7:00 a.m. to 8:00 p.m. 7:00). Failure to provide this report within the prescribed period may constitute a basis for…

Show full description

… failure to pass the reported work; 2) Hardware base location: the equipment and storage base should be located no more than 30 km from the city limits of Gostyń; 3) Winter maintenance of roads by snow removal in a way that ensures continuity of passage according to existing weather conditions; 4) Removing snow from streets or roads by scraping snow cover over its entire width and length. The snow collected shall not prevent or hinder the movement of vehicles, in particular: at intersections, entrances, exits, bus stops, pedestrian areas; 5) The Contractor will be obliged to perform a 24-hour telephone standby for the purpose of winter maintenance of access routes before the occurrence of snowfall sprinkling with salt of hills and places indicated by the Ordering Party, each time not later than 2 hours; as well as on each call of the Ordering Party. 6) Performing by the Contractor 24/7 on-call duty in the period from 01.11.2026 to 31.03.2027, i.e. a maximum of 151 days (in the absence of services to remove the effects of winter). On-call pay will not be paid for the days on which the winter recovery service will be provided. 7) The Contractor shall ensure the proper organisation and coordination of the service by securing the necessary staff and equipment. 8) The Contractor bears full responsibility for the quality, timeliness and safety of the service; 9) The equipment and machines provided for the execution of the order should be kept in constant readiness for operation; 10) Operation, repair and overhaul of the equipment provided for the performance of the service shall be the responsibility of the Contractor; 11) Working time is the actual working time of equipment when clearing snow and sprinkling streets - access to the base in connection with loading or refuelling equipment will not be counted as working time; 12) The Contractor is obliged to use a salt and sand mixture prepared by the Ordering Party and stored in the ZGKiM in Gostyń at ul. At Cana 107. 13) The Contractor will comply with health and safety regulations and provisions resulting from the Road Traffic Act of 20 June 1997 (Journal of Laws No. Journal of Laws 2024, item 1251 as amended); 14) The Contractor will be available 24 hours a day, including Sundays, Saturdays and public holidays, to provide services during the winter maintenance of roads; 15) The Contractor shall be liable for damages caused during the winter road maintenance operations in relation to third parties; 16) The Contractor accepts full material liability for any damage occurring in the course of performance of the contract for reasons attributable to him; 17) In the event of damage to third parties, the Contractor undertakes to cover it in full; 18) The size of the order depends on the prevailing weather conditions. The remuneration for the performance of services will be the remuneration for the time actually worked by the equipment documented by work reports confirmed by the employees of the Municipal Office in Gostyń. 19) The Ordering Party shall provide the Contractor with GPS devices intended for monitoring the equipment used to perform the task. W

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGmina Gostyń
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published25 September 2026
CategoryCleaning, environment & waste · CPV 90620000-9

Who has won here before

CompanyAwardsPeriod
Przedsiębiorstwo Drogowe Drogbud-Gostyń Sp. z o.o.112021–2026
PRZEWOZY OSOBOWE DOL-TRANS-TOUR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ102025–2026
PHU MM-TRANS Magdalena Majewska102025–2026
MILLA SPÓŁDZIELNIA W LESZNIE82021–2025
P.H.U.”CHOD-DRÓG” Andrzejewski Przemysław82023–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20211
20225
20231
20241
20253
20261

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 5 October at 11:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →