Comprehensive performance of investor supervision duties over the implementation of the investment: Conservatory and construction renovation of the "Willa Krzywoń" building entered in the register of monuments - II PROCEDURE
Kompleksowe pełnienie obowiązków nadzoru inwestorskiego nad realizacją inwestycji pn.: Remont konserwatorsko-budowlany budynku „Willa Krzywoń” wpisanego do rejestru zabytków - II POSTĘPOWANIE
Poland · Rabka-Zdrój · how to bid here →
Your path to submission
- Deadline: 6 October at 16:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 7 months (10 awards, most recently July 2026) — the next award is due around March 2027 by that rhythm. The last award went to Kierownik Budowy Wojciech Ciejka.n = 10
- 49% of this buyer's awards went to companies that had already won here before (181 awards since 2019, spread over 81 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 181 awards since 2019
- The median procedure drew just one bid (36 procedures with a bid count); 53% ended with a single bidder. Sector: median 4 bids.n = 36
- 3% of awards went to companies from abroad (181 awards with a known winner country). Sector average: 1%.n = 181
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
1. The subject of the contract is the provision of a comprehensive, paid service of performing the duties of multi-industry investor supervision during the implementation of the investment entitled: ‘Conservation and construction renovation of the ‘Willa Krzywoń’ building entered in the register of monuments of the Małopolska Region, under number a-832, with reconstruction, extension and change of use from a multi-family residential building with a service part to a cultural – exhibition building’, as part of the ‘Sources of history’ project, implemented with the participation of the European Regional Development Fund under the Interreg Poland-Slovakia Programme 2021-2027, Priority 3: Creative and attractive tourist borderland. Supervision must be carried out by industry specialists with appropriate powers provided for by applicable law. 2. The procurement documentation for the…
Show full description
… above-mentioned investment is available on the website at: https://platformazakupowa.pl/transaction/1325312 3. The Contractor assumes the task of comprehensively performing the duties of an investor supervision inspector for a fee in the field of, inter alia, technical, timely, financial and reporting, in particular in accordance with the requirements of the Construction Law Act of 7 July 1994, its implementing provisions and other applicable law, in particular health and safety regulations, environmental protection regulations, as well as applicable technical standards and the principles of technical knowledge and construction art. The Contractor undertakes to act in accordance with the current legal and technical situation, ensuring that supervision is properly carried out in accordance with the principles of professionalism and professional diligence. 4. The supervision service includes, in particular, supervision, verification of the completeness and compliance of the design documentation and PFU with the technical conditions, applicable law and the requirements of the Ordering Party, as well as control and supervision over the proper implementation of construction works by the Contractor, in accordance with the provisions, principles of technical knowledge and the provisions of the contract. 5. The Contractor’s responsibilities shall include, in particular: 1) performing the activities of a supervision inspector in accordance with the provisions of, in particular, Articles 25 and 26 of the Construction Law, 2) control and verification of technical solutions contained in the presented concepts and technical documentation, 3) coordination and supervision over the implementation of design changes, 4) monitoring the schedule of works, 5) drawing up records of receipt of documentation, 6) documenting findings and decisions regarding design changes or notes to documentation, 7) cooperation with the designer and the investor, including consulting the designer and the investor with any doubts regarding the project, 8) supervision over the compliance of the contractor's activities with applicable law, in particular with the Construction Law and OHS and environmental protection regulations, 9) handing over the construction site to the contractor, with the participation of the Employer, 10) technical control of works in terms of compliance with technical documentation, contract conditions, applicable provisions of construction law, current on the day of performance of works, building art, standards and applicable legal provisions, 11) controlling the quality of works performed, 12) ensuring the proper and timely implementation of the investment, 13) checking the proper security and organization of the construction site, 14) verifying, reviewing and approving the applications submitted by the Contractor for the approval of materials and equipment, 15) checking the completeness and correctness of documents drawn up by the Contractor during the implementation of the project and works (including financial settlements), in accordance with the provisions of the contract with the Contractor, 16) representing the Ordering Party on the construction site in all technical issues related to the implementation of the investment, 17) ongoing solving of technical problems of construction, 18) agreeing with the Ordering Party on any changes related to the construction
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| F.H.U. Kośmider Stanisław Kośmider | 20 | 2021–2026 |
| F.H.U ,,JURTEX’’ Teresa Paternoga | 12 | 2021–2025 |
| Zakłady Komunalne Sp. z o.o. | 10 | 2021–2025 |
| Rafał Konieczny PROFES Firma Remontowo-budowlana | 5 | 2021–2026 |
| PROFEXIM Spółka jawna H. J. Duda | 4 | 2022–2023 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.